Alberta Electric System Operator
New to the Site
- Letter of Notice – Consultation on Proposed Removal of Existing ISO OPP 807 BCTC Emergency Assistance Energy (“ISO OPP 807 Removal”) [1/26/2012]
- Letter of Notice – Consultation on Proposed Removal of Existing ISO OPP 803 SaskPower Emergency Assistance Energy (“ISO OPP 803 Removal”) [1/26/2012]
- Letter of Notice – Consultation on Proposed Removal of Existing ISO OPP 703 Loss Management (“ISO OPP 703 Removal”) [1/26/2012]
- Draft Information Document # 2012-002RS - Emergency Assistance Energy with Adjacent Balancing Authorities [1/26/2012]
- AESO Reply to Stakeholder Comments – AESO Consultation on Terms of Reference for proposed: a) New ISO Rules Section 502.7 SCADA and Phasor Measurement Unit Technical Requirements b) Removal of Existing ISO OPP 003.1 and c) Development of new ID [1/24/2012]
- AESO Reply to Stakeholder Comments – AESO Consultation on Terms of Reference for proposed: a) New ISO Rules Section 502.7 SCADA and Phasor Measurement Unit Technical Requirements b) Removal of Existing ISO OPP 003.1 and c) Development of new ID [1/24/2012]
- Amended Stakeholder Comments on Terms of Reference on posted: a) New ISO Rules Section 502.7 SCADA and Phasor Measurement Unit Technical Requirements b) Removal of Existing ISO OPP 003.1 and c) Development of new Information Document [1/24/2012]
- Testing on McNeill Converter Station [1/19/2012]
- Stakeholder Comments on Terms of Reference on Proposed: a) New ISO Rules Section 502.7 SCADA and Phasor Measurement Unit Technical Requirements b) Removal of Existing ISO OPP 003.1 and c) Development of new Information Document [1/19/2012]
- Need for McLaughlin Wind Power Facility connection in the Pincher Creek area [1/19/2012]
- Notice of Filing – Final Proposed Alberta Reliability Standard: Protection and Control "Disturbance Monitoring Equipment Installation and Data Reporting" PRC-018-AB-1 ("Final Proposed PRC-018-AB-1") [1/17/2012]
- Notice of Filing – Final Proposed New Protection and Control (“PRC”) Reliability Standard Definition (“Final Proposed New PRC Reliability Standard Definition”) [1/17/2012]
- Amended AESO Reply to Stakeholder Comments on Consultation for Proposed Alberta Reliability Standard: Emergency Preparedness and Operations "Emergency Operations Planning" EOP-001-AB-2b [1/17/2012]
- Albertans set another record demand for electricity [1/17/2012]
- Frigid Temperatures Drive Electricity Demand to New Record [1/16/2012]
Key Projects
- 2009 Deferral Account Reconciliation
- 2010 ISO Tariff Application
- 2011 Long-term Transmission Plan
- Alberta Reliability Standards
- Competitive Process
- Edmonton to Calgary Transmission Reinforcement
- Heartland Transmission Development
- Keephills 3 Interconnection and Edmonton Region 240 kV Line Upgrades
- Market Policy Implementation
- Southern Alberta Transmission Reinforcement
- Wind Power Integration



