Alberta Electric System Operator
New to the Site
- Market Systems Replacement (MSR) Project – Phase I (validation) [5/23/2013]
- Stakeholder Comments on Consultation on Proposed Alberta Reliability Standard: Proposed New, Amended and Removal of Alberta Reliability Standards Definitions ("Reliability Standards Definitions Update") [5/23/2013]
- Stakeholder Comments on Consultation on Proposed Alberta Reliability Standard: Proposed Amendments to Reflect Formatting, Drafting Style and Other Administrative Changes ("Reliability Standards Administrative Updates") [5/23/2013]
- Notification of Regulatory Filing [5/22/2013]
- Need for Irish Creek Substation 706S Upgrade in the Elk Point Area [5/22/2013]
- Technical Difficulties with the Internal Network Systems [5/16/2013]
- AESO Reply to Stakeholder Comments – Second Consultation on Proposed New ISO Rules Section 502.5 Generating Unit Technical Requirements and location under the New ISO Rules Framework (“New ISO Rules Section 502.5 Version 2.0”) [5/16/2013]
- AESO Reply to Stakeholder Comments – Consultation on Proposed New ISO Rules Section 502.6 Generating Unit Operational Requirements and location under the New ISO Rules Framework (“New ISO Rules Section 502.6") [5/16/2013]
- Stakeholder Comments on Letter of Notice – Consultation on the Proposed Amendments to Existing ISO Rules Section 202.2 Short Term Adequacy and Supply Shortfall (“ISO Rules Section 202.2 Changes”) [5/16/2013]
- Notice: Updated ISO Rule 9.1 Compliance Monitoring [5/16/2013]
- Notice of Filing - Consultation on Proposed Changes to Existing ISO Rules and Proposed Removal of Existing ISO Rules: a) Amendments to ISO Rules Section 303.1 and ISO OPP 402 b) Removal of ISO OPP 1301 (collectively the “MATL Rules Changes”) [5/13/2013]
- Need for the Timberland Substation in Northeast Red Deer [5/10/2013]
- Ground-Breaking Competition - A New Approach to Meeting the Need for Transmission in Alberta [5/9/2013]
- AESO Reply to Stakeholder Comments - Second Consultation on Proposed New ISO Rules Section 304.4 Maintaining Network Voltage ("New ISO Rules Section 304.4 Version 2.0") [5/9/2013]
Key Projects
- 2010 - 2011 Deferral Account Reconciliation
- 2012 Contribution Policy
- Long-term Transmission Plan
- Alberta Reliability Standards
- Contribution Policy
- Competitive Process
- Edmonton to Calgary Transmission Reinforcement
- Heartland Transmission System Reinforcement
- Keephills 3 Interconnection and Edmonton Region 240 kV Line Upgrades
- Market Policy Implementation
- Southern Alberta Transmission Reinforcement
- Wind Power Integration



