Alberta Electric System Operator

                                                                    System Co-ordination Plan

                                                                                                2012-02-04  to   2012-02-10

                                                                                             Approved Outages

     Date From      Time       Date To    Time To         Owner          Type       Element                      Scheduled Activity  Interconnection

                        From

    27-Oct-11     8:00      15-Feb-12    16:00      ENMAX            Outage      ENMAX 31.1 cap bank   forced outage               Continuous      AB-BC

                                                                                                        (FORCED)

    08-Nov-11     8:00      01-Apr-12     12:00      ATCO              SW ONLY   707s St. Paul 6L79       winter operating limit requires 6L79    Continuous

                                                                                                                                         open ended

    16-Nov-11     1:00      29-Feb-12    17:00      ATCO              Outage      828s Sulphur Point       damage (one wafer blow up)   Continuous

                                                                                                        507C1 and 507C2

                                                                                                        (forced outage)

    21-Nov-11     9:00      28-Feb-12    15:00      ATCO              SW ONLY   839s401(839s             bypassed                     Continuous

                                                                                                        Daishowa)

    05-Jan-12     8:00      15-Mar-12    17:00      AltaLink           Outage      745L (58s Edson -        745L re-build                Continuous

                                                                                                        745L985)

    05-Jan-12     8:00      05-Mar-12     8:00       ATCO              Outage      853s701T (853s Ring   install new piles and new equipment   Continuous

                                                                                                        Creek) & 7L82 (853s

                                                                                                        Ring Creek - 7L82 Tap)

    13-Jan-12    17:01     15-Mar-12    16:00      ENMAX            Outage      162B240-RB135 (162s moved to replace failed breaker    Continuous

                                                                                                         Beddington)                RB135

    16-Jan-12     7:30      07-Feb-12    17:00      AltaLink           Outage      906L (42s Sarcee - 17s line move                     Continuous      AB-BC

                                                                                                         Benalto)

    16-Jan-12     8:00      07-Feb-12    17:00      ENMAX            RB, HOP    138-36.81L                 lower conductor                          C

    19-Jan-12    17:00     04-Apr-12     17:00      ATCO              Outage      856s900BUS1 (no        install new 240 kV breakers and    Continuous

                                                                                                        outage)                       associated equipment

    21-Jan-12     8:00      07-Feb-12    17:00      AltaLink           RB            928L (17s-42s) R/B.     safety clerance - 906L work      Daily

    01-Feb-12     8:00      13-Feb-12    18:00      ATCO              RB            7L133 NONE               maintenance                Continuous

    01-Feb-12     8:30      07-Feb-12     8:30       ATCO              Outage      722s701T & 722s511    new POD metering        Continuous

                                                                                                        (Crystal Lake)

    03-Feb-12     7:00      10-Feb-12    17:00      AltaLink           RB            100L (498s - 895s) R/B tower placing for 1034/1035L    Daily

    03-Feb-12     8:00      28-Feb-12    16:00      EPCOR           Outage      1045L (805s Jasper -    Jasper re-string project  Continuous

                                                                                                        310p Sundance)

    03-Feb-12     8:00      27-Feb-12    16:00      AltaLink           Outage      1045L (310p - E805s)   EPCOR re-stringing portion of 1045L Continuous

                                                                                                        Advice for Epcor

    03-Feb-12     8:00      28-Feb-12    16:00      EPCOR           RB            1044L (805s Jasper-    Jasper re-string project  Continuous

                                                                                                        816s Petrolia)

    04-Feb-12     8:00      04-Feb-12    12:00      ENMAX            Outage      1.80L (ENMAX 1 -          insulator washing @ 28 Sub         D

                                                                                                        ENMAX 28) / 10.60L

                                                                                                        (ENMAX 10 - ENTMAX

                                                                                                        28) / 28.1TR / 28.3TR


    04-Feb-12    12:00     04-Feb-12    16:00      ENMAX            Outage      28.80L (ENMAX 28 -      insulator washing @ 28 sub         D

                                                                                                        42s Sarcee) / 10.60L

                                                                                                        (ENMAX 10 - ENMAX

                                                                                                        28) / 28.2TR/28.3TR

    05-Feb-12     8:00      05-Feb-12    16:00      ENMAX            Outage      9.80L (ENMAX 9 -          insulator washing at  31 sub         D      AB-BC

                                                                                                        ENMAX 31), 31.1Tr, &

                                                                                                        31.1 cap

    05-Feb-12    12:00     05-Feb-12    16:00      ENMAX            Outage      31.84L (ENMAX 31 -      insulator washing @ 31 sub         D

                                                                                                        ENMAX 31), 24.81L

                                                                                                        (ENMAX 24 - ENMAX

                                                                                                        31), 31.2TR, 31.3TR,

                                                                                                        138kV PTs

    06-Feb-12     8:00      06-Feb-12    12:00      ENMAX            Outage      2.81L (ENMAX 2 -          insulator washing                       D

                                                                                                        ENMAX 9) , 9.83L

                                                                                                        (ENMAX 9 - ENMAX

                                                                                                        43) , 9.2TR, and 9.3TR

    06-Feb-12     8:00      07-Feb-12    16:00      ENMAX            Outage      14.83L (ENMAX 14 -      switch maintenance and insulator C

                                                                                                        ENMAX 36), 16.63L       washing

                                                                                                        (ENMAX 16 - ENMAX

                                                                                                        36), 36.2TR, 36.5TR,

                                                                                                        and 69 KV PTs

    06-Feb-12     8:00      08-Feb-12    12:00      EPCOR           Outage      987sC2403 (987s        protection upgrades       Continuous

                                                                                                        Clover Bar)

    06-Feb-12     8:00      09-Feb-12    16:00      EPCOR           Outage      72RV6 (Rossdale -       prtection testing                    CONT

                                                                                                        Victoria)

    06-Feb-12     8:00      10-Feb-12    16:00      EPCOR           Outage      814sT1 (814s Bellamy) replace BD1E switch      Continuous

    06-Feb-12     8:00      10-Feb-12    17:00      AltaLink           Outage      913L (732s Mitsue-69s pole replacement and maintenance       Daily

                                                                                                        North Barhead)

    06-Feb-12     8:00      09-Feb-12    17:00      ATCO              RB            7L86 R/B                    maintenance/ bolt replacement   Continuous

    06-Feb-12     8:30      10-Feb-12    17:30      ATCO              Outage      9L913 (732s Mitsue -    replace poles               Continuous

                                                                                                        69s North Barhead)

    06-Feb-12     9:30      07-Feb-12    17:30      AltaLink           TE            102s Langdon relay      standard relay maintenance     Daily

    06-Feb-12    10:00     06-Feb-12    16:00      AltaLink           TE            337s Canadian Liquid   work on transducer scaling

                                                                                                        Air RTU

    06-Feb-12    10:30     06-Feb-12    17:00      AltaLink           RB            995L (62s - 68s - 17s)   general maintenance

                                                                                                        R/B

    06-Feb-12    12:00     06-Feb-12    16:00      ENMAX            Outage      9.80L (ENMAX 9 -          insulator washing                       D

                                                                                                        ENMAX 31) and 9.1TR

    06-Feb-12    13:00     06-Feb-12    14:00      ATCO              TE            743s Sarah Lake          relay testing

    06-Feb-12    14:00     06-Feb-12    15:00      ATCO              TE            743S Sarah Lake         relay testing

    07-Feb-12     8:00      07-Feb-12    16:00      EPCOR           Outage      803s Lambton T1         arc flash measuements               D

    07-Feb-12     8:00      08-Feb-12    12:00      EPCOR           Outage      987s Clover Bar T1       protection upgrades       Continuous

    07-Feb-12     8:00      07-Feb-12    12:00      ENMAX            Outage      31.84L (ENMAX 31 -      insulator washing @ 32 Sub         D

                                                                                                        ENMAX 32) & 32.1TR

    07-Feb-12     8:00      08-Feb-12    12:00      EPCOR           Outage      915L (987S Clover Bar protection upgrades       Continuous

                                                                                                        - 38S East Edmonton)

    07-Feb-12     8:00      08-Feb-12    17:00      AltaLink           RB            995L(62s-68s-17s) R/B.                     general maintenance       Daily


    07-Feb-12     8:00      09-Feb-12    17:00      AltaLink           RB            789L (818s - A898s) R/B         Raise structures for high load        Daily

                                                                                                                                         corridor

    07-Feb-12     8:00      09-Feb-12    17:00      AltaLink           TE            320p Keephills relay     relay maintenance         Continuous

    07-Feb-12     8:00      09-Feb-12    17:00      ATCO              COND GTE                                                             898s Heart Lake   Continuous

    07-Feb-12     8:30      08-Feb-12    16:30      AltaLink           TE            13s Relay                   Relay maintenance        Continuous

    07-Feb-12     8:30      08-Feb-12    12:00      ATCO              Outage      722s510 ( 722s Crystal CT work                       Continuous

                                                                                                         Lake) & 702T

    07-Feb-12     8:30      07-Feb-12    12:30      ATCO              COND GTE    743s Sarah Lake

                                                                                                        6L126

    07-Feb-12     9:00      07-Feb-12    15:00      AltaLink           TE            653s Mux - Info             Reconfiguration of Mux Settings

    07-Feb-12     9:00      07-Feb-12    16:00      AltaLink           TE            51s Wainwright - 252s   routine maintenance of MDS radio

                                                                                                        Radio  Supervisory

    07-Feb-12     9:00      07-Feb-12    16:00      AltaLink           TE            296s Radio                 routine maintenance of MDS radio

                                                                                                        Supervisory

    07-Feb-12     9:00      07-Feb-12    12:00      AltaLink           Outage      526L (268s Whitecourt high load move

                                                                                                        - 526DL185)

    07-Feb-12    10:30     07-Feb-12    16:30      ATCO              TE            721s Lacorey               701T 50/51 & 87 relay testing

    07-Feb-12    12:00     07-Feb-12    16:00      ENMAX            Outage      32.83L (ENMAX 32 -      insulator washing @ 32 Sub         D

                                                                                                        ENMAX 40), 26.81L

                                                                                                        (ENMAX 32 - ENMAX

                                                                                                        26), 32.2TR & 138kV

                                                                                                        PTs

    07-Feb-12    17:30     21-Feb-12    17:00      AltaLink           Outage      928L (17s Benalto-42s line move                     Continuous      AB-BC

                                                                                                        Sarcee)

    08-Feb-12     8:00      08-Feb-12    16:00      EPCOR           Outage      557s Castle Downs      P/C breaker Op checks CD2401 & D

                                                                                                        Transformer T1            CD2406

    08-Feb-12     8:00      09-Feb-12    16:00      ENMAX            Outage      9.61L/9.62L (ENMAX     switch maintenacne & insulator     C

                                                                                                        23 - ENMAX 10)            washing @ 23 Sub

    08-Feb-12     8:00      08-Feb-12    10:00      ENMAX            Outage      1.81L (ENMAX 20 -        insulator washing @ 20 Sub         D

                                                                                                        ENMAX 1), 20.1TR

    08-Feb-12     8:00      09-Feb-12    16:00      EPCOR           Outage      557s Castle Downs      duct line construction     Continuous

                                                                                                        transformer T1

    08-Feb-12     8:00      21-Feb-12    17:00      ENMAX            RB, HOP    906L/928L Tuscany      install poles, string over 36.81L     C

                                                                                                        project

    08-Feb-12     8:00      21-Feb-12    17:00      AltaLink           RB            906L (17s - 42s) R/B     safety clearance                     Daily

    08-Feb-12     8:00      21-Feb-12    17:00      AltaLink           RB            36.81L (44s Bearspaw install rider poles          Continuous

                                                                                                        - ENMAX 36) R/B

    08-Feb-12     8:00      09-Feb-12    17:00      AltaLink           TE            320p Keephills relay     relay maintenance         Continuous

    08-Feb-12     9:00      08-Feb-12    14:00      ENMAX            IO             30.81L (ENMAX 30 -      reconfigure L90 relay protection     D

                                                                                                        42s Sarcee) & 138 kV

                                                                                                        bus differential @ 30

                                                                                                        Sub

    08-Feb-12     9:00      08-Feb-12    16:30      ATCO              TE            822s Wolf Lake            701T 87 relay testing

    08-Feb-12    10:00     08-Feb-12    12:00      ENMAX            Outage      20.82L (ENAMX 20 -      insulator washing @ 20 Sub         D

                                                                                                        ENMAX 21), 20.3TR


    08-Feb-12    10:00     08-Feb-12    14:00      ATCO              Outage      813s717 (813s Little     breaker maintenance

                                                                                                        Smoky)

    08-Feb-12    12:00     08-Feb-12    14:00      ENMAX            Outage      16.61L (ENMAX 27 -      insulator washing @ 27 Sub         D

                                                                                                        ENMAX 16),

                                                                                                        27.1TR/69kV PTs

    08-Feb-12    12:30     10-Feb-12    16:00      EPCOR           Outage      987s Clover Bar C2404 P/C breaker fail protection    Continuous

                                                                                                         breaker                      upgrades

    08-Feb-12    14:00     08-Feb-12    16:00      ENMAX            Outage      13.60L (ENMAX 27 -      insulator washing @ 27 Sub         D

                                                                                                        ENMAX 13), 27.2TR

    08-Feb-12    23:00     09-Feb-12     3:00       AltaLink           Outage      62s12 (62s Brazeau)    maintenance                Continuous

    09-Feb-12     3:00      09-Feb-12     7:00       AltaLink           Outage      62s11 (62s Brazeau)    maintenance

    09-Feb-12     8:00      09-Feb-12    12:00      ENMAX            Outage      33.83L (ENMAX 33 -      insulator washing @ 33 Sub         D

                                                                                                        ENMAX 41)/

                                                                                                        33.1TR/33PT138-Z31

    09-Feb-12     8:00      09-Feb-12    14:00      AltaLink           RB            995L (62s-68s-17s)      general maintenance

                                                                                                        R/B.

    09-Feb-12     8:00      09-Feb-12    17:00      ATCO              TE            743s Sarah Lake          7L55 21 & 67 realy testing OAT

    09-Feb-12    10:00     09-Feb-12    13:00      ATCO              TE            700s Bonnyville            702T 87 relay testing

    09-Feb-12    12:00     09-Feb-12    16:00      ENMAX            Outage      33.84L (ENMAX 33 -      insulator washing @ 33 Sub         D

                                                                                                        ENMAX 43)/ 33.2TR/

                                                                                                        33PT138-Z31

    09-Feb-12    13:00     09-Feb-12    14:30      ATCO              TE            743s Sarah Lake          7L230 21 relay testing

    10-Feb-12     8:00      10-Feb-12    12:00      ENMAX            Outage      13.82L (ENMAX 22 -      insulator washing at ENMAX 22     D

                                                                                                        ENMAX 13), 22.1TR

                                                                                                        (ENMAX 22) & 22.3TR

                                                                                                        (ENMAX 22)

    10-Feb-12     8:00      10-Feb-12    17:00      EPCOR           Outage      947L (987s Clover Bar   protection upgrades                Daily

                                                                                                        - 89s Ellersilie)

    10-Feb-12     8:00      17-Feb-12    18:00      ATCO              RB            9L55 (885s - 898s) R/B Set piles for tap-off on 9L55   Continuous

    10-Feb-12    12:00     10-Feb-12    16:00      ENMAX            Outage      22.81L (ENMAX 22 -      insulator washing @ 22 Sub         D

                                                                                                        ENMAX 39) & 22.2TR

                                                                                                        (ENMAX 22)

    10-Feb-12    19:30     12-Feb-12    19:30      ENMAX            Outage      917L (74s Janet - 5s     install new structure                    C

                                                                                                        East Calgary)

    10-Feb-12    19:30     12-Feb-12    16:00      ENMAX            RB            2.80L (ENMAX 2 -          install new structure                    C

                                                                                                        ENMAX 23) R/B

Prepared on: February-02-2012 16:46                                                     Approved Outages                                       Page 4 of 4

This document and the information contained herein are based upon information and data which by their nature contain a degree of uncertainty and are subject to change.  In addition,

this document may contain information and data from public sources and/or third parties, which have been assumed to be accurate and complete and have not been verified. 

Accordingly, the Independent System Operator, operating as the Alberta Electric System Operator (the “AESO”) makes no warranty, representation or guarantee, express or implied,

with respect to this document or the information contained herein, including, but not limited to, any warranty, representation or guarantee of accuracy, completeness, timeliness, reliability,

 availability, absence of computer virus, non-infringement, merchantability or suitability for any purpose.  Under no circumstances will the AESO, its members, officers, employees,

contractors or agents, or any of their respective affiliates, be liable for any errors or omissions in, or any losses, damages or claims whatsoever, whether in contract, tort or otherwise,

arising from use of or reliance upon, this document or any information contained herein.   

 

© 2009 Alberta Electric System Operator.  All rights reserved.