Alberta Electric System
Operator
System Co-ordination Plan
2012-02-04 to 2012-02-10
Approved Outages
Date From Time Date To Time To Owner Type Element Scheduled Activity Interconnection
From
27-Oct-11 8:00 15-Feb-12 16:00 ENMAX Outage ENMAX 31.1 cap bank forced outage Continuous AB-BC
(FORCED)
08-Nov-11 8:00 01-Apr-12 12:00 ATCO SW ONLY 707s St. Paul 6L79 winter operating limit requires 6L79 Continuous
open ended
16-Nov-11 1:00 29-Feb-12 17:00 ATCO Outage 828s Sulphur Point damage (one wafer blow up) Continuous
507C1 and 507C2
(forced outage)
21-Nov-11 9:00 28-Feb-12 15:00 ATCO SW ONLY 839s401(839s bypassed Continuous
Daishowa)
05-Jan-12 8:00 15-Mar-12 17:00 AltaLink Outage 745L (58s Edson - 745L re-build Continuous
745L985)
05-Jan-12 8:00 05-Mar-12 8:00 ATCO Outage 853s701T (853s Ring install new piles and new equipment Continuous
Creek) & 7L82 (853s
Ring Creek - 7L82 Tap)
13-Jan-12 17:01 15-Mar-12 16:00 ENMAX Outage 162B240-RB135 (162s moved to replace failed breaker Continuous
Beddington) RB135
16-Jan-12 7:30 07-Feb-12 17:00 AltaLink Outage 906L (42s Sarcee - 17s line move Continuous AB-BC
Benalto)
16-Jan-12 8:00 07-Feb-12 17:00 ENMAX RB, HOP 138-36.81L lower conductor C
19-Jan-12 17:00 04-Apr-12 17:00 ATCO Outage 856s900BUS1 (no install new 240 kV breakers and Continuous
outage) associated equipment
21-Jan-12 8:00 07-Feb-12 17:00 AltaLink RB 928L (17s-42s) R/B. safety clerance - 906L work Daily
01-Feb-12 8:00 13-Feb-12 18:00 ATCO RB 7L133 NONE maintenance Continuous
01-Feb-12 8:30 07-Feb-12 8:30 ATCO Outage 722s701T & 722s511 new POD metering Continuous
(Crystal Lake)
03-Feb-12 7:00 10-Feb-12 17:00 AltaLink RB 100L (498s - 895s) R/B tower placing for 1034/1035L Daily
03-Feb-12 8:00 28-Feb-12 16:00 EPCOR Outage 1045L (805s Jasper - Jasper re-string project Continuous
310p Sundance)
03-Feb-12 8:00 27-Feb-12 16:00 AltaLink Outage 1045L (310p - E805s) EPCOR re-stringing portion of 1045L Continuous
Advice for Epcor
03-Feb-12 8:00 28-Feb-12 16:00 EPCOR RB 1044L (805s Jasper- Jasper re-string project Continuous
816s Petrolia)
04-Feb-12 8:00 04-Feb-12 12:00 ENMAX Outage 1.80L (ENMAX 1 - insulator washing @ 28 Sub D
ENMAX 28) / 10.60L
(ENMAX 10 - ENTMAX
28) / 28.1TR / 28.3TR
04-Feb-12 12:00 04-Feb-12 16:00 ENMAX Outage 28.80L (ENMAX 28 - insulator washing @ 28 sub D
42s Sarcee) / 10.60L
(ENMAX 10 - ENMAX
28) / 28.2TR/28.3TR
05-Feb-12 8:00 05-Feb-12 16:00 ENMAX Outage 9.80L (ENMAX 9 - insulator washing at 31 sub D AB-BC
ENMAX 31), 31.1Tr, &
31.1 cap
05-Feb-12 12:00 05-Feb-12 16:00 ENMAX Outage 31.84L (ENMAX 31 - insulator washing @ 31 sub D
ENMAX 31), 24.81L
(ENMAX 24 - ENMAX
31), 31.2TR, 31.3TR,
138kV PTs
06-Feb-12 8:00 06-Feb-12 12:00 ENMAX Outage 2.81L (ENMAX 2 - insulator washing D
ENMAX 9) , 9.83L
(ENMAX 9 - ENMAX
43) , 9.2TR, and 9.3TR
06-Feb-12 8:00 07-Feb-12 16:00 ENMAX Outage 14.83L (ENMAX 14 - switch maintenance and insulator C
ENMAX 36), 16.63L washing
(ENMAX 16 - ENMAX
36), 36.2TR, 36.5TR,
and 69 KV PTs
06-Feb-12 8:00 08-Feb-12 12:00 EPCOR Outage 987sC2403 (987s protection upgrades Continuous
Clover Bar)
06-Feb-12 8:00 09-Feb-12 16:00 EPCOR Outage 72RV6 (Rossdale - prtection testing CONT
Victoria)
06-Feb-12 8:00 10-Feb-12 16:00 EPCOR Outage 814sT1 (814s Bellamy) replace BD1E switch Continuous
06-Feb-12 8:00 10-Feb-12 17:00 AltaLink Outage 913L (732s Mitsue-69s pole replacement and maintenance Daily
North Barhead)
06-Feb-12 8:00 09-Feb-12 17:00 ATCO RB 7L86 R/B maintenance/ bolt
replacement Continuous
06-Feb-12 8:30 10-Feb-12 17:30 ATCO Outage 9L913 (732s Mitsue - replace poles Continuous
69s North Barhead)
06-Feb-12 9:30 07-Feb-12 17:30 AltaLink TE 102s Langdon relay standard relay maintenance Daily
06-Feb-12 10:00 06-Feb-12 16:00 AltaLink TE 337s Canadian Liquid work on transducer scaling
Air RTU
06-Feb-12 10:30 06-Feb-12 17:00 AltaLink RB 995L (62s - 68s - 17s) general maintenance
R/B
06-Feb-12 12:00 06-Feb-12 16:00 ENMAX Outage 9.80L (ENMAX 9 - insulator washing D
ENMAX 31) and 9.1TR
06-Feb-12 13:00 06-Feb-12 14:00 ATCO TE 743s Sarah Lake relay testing
06-Feb-12 14:00 06-Feb-12 15:00 ATCO TE 743S Sarah Lake relay testing
07-Feb-12 8:00 07-Feb-12 16:00 EPCOR Outage 803s Lambton T1 arc flash measuements D
07-Feb-12 8:00 08-Feb-12 12:00 EPCOR Outage 987s Clover Bar T1 protection upgrades Continuous
07-Feb-12 8:00 07-Feb-12 12:00 ENMAX Outage 31.84L (ENMAX 31 - insulator washing @ 32 Sub D
ENMAX 32) & 32.1TR
07-Feb-12 8:00 08-Feb-12 12:00 EPCOR Outage 915L (987S Clover Bar protection upgrades Continuous
- 38S East Edmonton)
07-Feb-12 8:00 08-Feb-12 17:00 AltaLink RB 995L(62s-68s-17s) R/B. general maintenance Daily
07-Feb-12 8:00 09-Feb-12 17:00 AltaLink RB 789L (818s - A898s) R/B Raise structures for high load Daily
corridor
07-Feb-12 8:00 09-Feb-12 17:00 AltaLink TE 320p Keephills relay relay maintenance Continuous
07-Feb-12 8:00 09-Feb-12 17:00 ATCO COND GTE 898s Heart Lake Continuous
07-Feb-12 8:30 08-Feb-12 16:30 AltaLink TE 13s Relay Relay maintenance Continuous
07-Feb-12 8:30 08-Feb-12 12:00 ATCO Outage 722s510 ( 722s Crystal CT work Continuous
Lake) & 702T
07-Feb-12 8:30 07-Feb-12 12:30 ATCO COND GTE 743s Sarah Lake
6L126
07-Feb-12 9:00 07-Feb-12 15:00 AltaLink TE 653s Mux - Info Reconfiguration of Mux Settings
07-Feb-12 9:00 07-Feb-12 16:00 AltaLink TE 51s Wainwright - 252s routine maintenance of MDS radio
Radio Supervisory
07-Feb-12 9:00 07-Feb-12 16:00 AltaLink TE 296s Radio routine maintenance of MDS radio
Supervisory
07-Feb-12 9:00 07-Feb-12 12:00 AltaLink Outage 526L (268s Whitecourt high load move
- 526DL185)
07-Feb-12 10:30 07-Feb-12 16:30 ATCO TE 721s Lacorey 701T 50/51 & 87 relay testing
07-Feb-12 12:00 07-Feb-12 16:00 ENMAX Outage 32.83L (ENMAX 32 - insulator washing @ 32 Sub D
ENMAX 40), 26.81L
(ENMAX 32 - ENMAX
26), 32.2TR & 138kV
PTs
07-Feb-12 17:30 21-Feb-12 17:00 AltaLink Outage 928L (17s Benalto-42s line move Continuous AB-BC
Sarcee)
08-Feb-12 8:00 08-Feb-12 16:00 EPCOR Outage 557s Castle Downs P/C breaker Op checks CD2401 & D
Transformer T1 CD2406
08-Feb-12 8:00 09-Feb-12 16:00 ENMAX Outage 9.61L/9.62L (ENMAX switch maintenacne & insulator C
23 - ENMAX 10) washing @ 23 Sub
08-Feb-12 8:00 08-Feb-12 10:00 ENMAX Outage 1.81L (ENMAX 20 - insulator washing @ 20 Sub D
ENMAX 1), 20.1TR
08-Feb-12 8:00 09-Feb-12 16:00 EPCOR Outage 557s Castle Downs duct line construction Continuous
transformer T1
08-Feb-12 8:00 21-Feb-12 17:00 ENMAX RB, HOP 906L/928L Tuscany install poles, string over 36.81L C
project
08-Feb-12 8:00 21-Feb-12 17:00 AltaLink RB 906L (17s - 42s) R/B safety clearance Daily
08-Feb-12 8:00 21-Feb-12 17:00 AltaLink RB 36.81L (44s Bearspaw install rider poles Continuous
- ENMAX 36) R/B
08-Feb-12 8:00 09-Feb-12 17:00 AltaLink TE 320p Keephills relay relay maintenance Continuous
08-Feb-12 9:00 08-Feb-12 14:00 ENMAX IO 30.81L (ENMAX 30 - reconfigure L90 relay protection D
42s Sarcee) & 138 kV
bus differential @ 30
Sub
08-Feb-12 9:00 08-Feb-12 16:30 ATCO TE 822s Wolf Lake 701T 87 relay testing
08-Feb-12 10:00 08-Feb-12 12:00 ENMAX Outage 20.82L (ENAMX 20 - insulator washing @ 20 Sub D
ENMAX 21), 20.3TR
08-Feb-12 10:00 08-Feb-12 14:00 ATCO Outage 813s717 (813s Little breaker maintenance
Smoky)
08-Feb-12 12:00 08-Feb-12 14:00 ENMAX Outage 16.61L (ENMAX 27 - insulator washing @ 27 Sub D
ENMAX 16),
27.1TR/69kV PTs
08-Feb-12 12:30 10-Feb-12 16:00 EPCOR Outage 987s Clover Bar C2404 P/C breaker fail protection Continuous
breaker upgrades
08-Feb-12 14:00 08-Feb-12 16:00 ENMAX Outage 13.60L (ENMAX 27 - insulator washing @ 27 Sub D
ENMAX 13), 27.2TR
08-Feb-12 23:00 09-Feb-12 3:00 AltaLink Outage 62s12 (62s Brazeau) maintenance Continuous
09-Feb-12 3:00 09-Feb-12 7:00 AltaLink Outage 62s11 (62s Brazeau) maintenance
09-Feb-12 8:00 09-Feb-12 12:00 ENMAX Outage 33.83L (ENMAX 33 - insulator washing @ 33 Sub D
ENMAX 41)/
33.1TR/33PT138-Z31
09-Feb-12 8:00 09-Feb-12 14:00 AltaLink RB 995L (62s-68s-17s) general maintenance
R/B.
09-Feb-12 8:00 09-Feb-12 17:00 ATCO TE 743s Sarah Lake 7L55 21 & 67 realy testing OAT
09-Feb-12 10:00 09-Feb-12 13:00 ATCO TE 700s Bonnyville 702T 87 relay testing
09-Feb-12 12:00 09-Feb-12 16:00 ENMAX Outage 33.84L (ENMAX 33 - insulator washing @ 33 Sub D
ENMAX 43)/ 33.2TR/
33PT138-Z31
09-Feb-12 13:00 09-Feb-12 14:30 ATCO TE 743s Sarah Lake 7L230 21 relay testing
10-Feb-12 8:00 10-Feb-12 12:00 ENMAX Outage 13.82L (ENMAX 22 - insulator washing at ENMAX 22 D
ENMAX 13), 22.1TR
(ENMAX 22) & 22.3TR
(ENMAX 22)
10-Feb-12 8:00 10-Feb-12 17:00 EPCOR Outage 947L (987s Clover Bar protection upgrades Daily
- 89s Ellersilie)
10-Feb-12 8:00 17-Feb-12 18:00 ATCO RB 9L55 (885s - 898s) R/B Set piles for tap-off on 9L55 Continuous
10-Feb-12 12:00 10-Feb-12 16:00 ENMAX Outage 22.81L (ENMAX 22 - insulator washing @ 22 Sub D
ENMAX 39) & 22.2TR
(ENMAX 22)
10-Feb-12 19:30 12-Feb-12 19:30 ENMAX Outage 917L (74s Janet - 5s install new structure C
East Calgary)
10-Feb-12 19:30 12-Feb-12 16:00 ENMAX RB 2.80L (ENMAX 2 - install new structure C
ENMAX 23) R/B
Prepared on: February-02-2012 16:46 Approved Outages Page 4 of 4
This document and the information
contained herein are based upon information and data which by their nature
contain a degree of uncertainty and are subject to change. In addition,
this document may contain information and data from public sources
and/or third parties, which have been assumed to be accurate and complete and
have not been verified.
Accordingly, the Independent System Operator, operating as the
Alberta Electric System Operator (the “AESO”) makes no warranty, representation
or guarantee, express or implied,
with respect to this document or the information contained herein,
including, but not limited to, any warranty, representation or guarantee of
accuracy, completeness, timeliness, reliability,
availability, absence of
computer virus, non-infringement, merchantability or suitability for any
purpose. Under no circumstances will the
AESO, its members, officers, employees,
contractors or agents, or any of their respective affiliates, be
liable for any errors or omissions in, or any losses, damages or claims
whatsoever, whether in contract, tort or otherwise,
arising from use of or reliance upon, this document or any
information contained herein.
© 2009 Alberta Electric System Operator. All rights reserved.