Proposed Alberta Reliability Standards
The Alberta Electric System Operator's (AESO) approach to adopting a North American Electric Reliability Corporation (NERC) reliability standard for the Alberta region involves the ISO rules process. This process includes public stakeholder review, responding to stakeholder comments, submission to the AESO Executive Rules Committee (ERC) for approval, and finally, filing with the Alberta Utilities Commission (AUC). For more details on the process click here.
February
January
-
Notice of Filing – Final Proposed Alberta Reliability Standard: Protection and Control "Disturbance Monitoring Equipment Installation and Data Reporting" PRC-018-AB-1 ("Final Proposed PRC-018-AB-1")
[Posted: January 17, 2012] - 2012-01-17 DME Locations Document
- 2012-01-17 PRC-018-AB-1 ARS Document for Filing.pdf
-
Notice of Filing – Final Proposed New Protection and Control (“PRC”) Reliability Standard Definition (“Final Proposed New PRC Reliability Standard Definition”)
[Posted: January 17, 2012] - 2012-01-17 prc-018 (dme) final - clean
-
Amended AESO Reply to Stakeholder Comments on Consultation for Proposed Alberta Reliability Standard: Emergency Preparedness and Operations "Emergency Operations Planning" EOP-001-AB-2b
[Posted: January 17, 2012] - 2012-01-17 EOP-001-AB-2b SCR for Filing (2)
- 2012-01-17 EOP-001-AB-2b ARS for Filing
December
-
Notice of Filing - Final Proposed Alberta Reliability Standard: Interconnection Reliability Operations and Coordination "Reliability Coordination Responsibilities and Authorities" IRO-001-AB-1.1 ("Final Proposed IRO-001-AB-1.1")
[Posted: December 7, 2011] - 2011-12-07 Final Draft IRO-001-AB-1 ARS Document
November
-
AESO Reply to Stakeholder Comments on Second Consultation for Proposed Alberta Reliability Standard: Protection and Control Disturbance Monitoring Equipment Installation and Data Reporting PRC-018-1 ("PRC-018-AB-1 Draft 2.1")
[Posted: November 25, 2011] - 2011-11-25 PRC-018-AB-1 SCR Document for Filing - Final
- 2011-11-25 PRC-018-AB-1 ARS Document for Filing
- 2011-11-25 DME Locations Document
-
AESO Reply to Stakeholder Comments on Proposed New Protection and Control ("PRC") Reliability Standard Definition ("New PRC Reliability Standard Definition")
[Posted: November 25, 2011] - 2011-11-25 Reply Matrix PRC Definitions (PRC-018) for Filing - Final
- 2011-11-25 prc-018 (dme) final-blackline
- 2011-11-25 prc-018 (dme) final - clean
-
AESO Reply to Stakeholder Comments on Consultation for Proposed Alberta Reliability Standard: Interconnection Reliability Operations and Coordination Reliability Coordination Responsibilities and Authorities IRO-001-AB-1 ("IRO-001-AB-1")
[Posted: November 24, 2011] - 2011-11-24 Final Draft IRO-001-AB-1 SCCR
- 2011-11-24 Final Draft IRO-001-AB-1 ARS Document.
-
AESO Reply to Stakeholder Comments on Consultation for Proposed Alberta Reliability Standard: Emergency Preparedness and Operations Emergency Operations Planning EOP-001-AB-2b (originally consulted on as EOP-001-AB-1) ("EOP-001-AB-2b")
[Posted: November 24, 2011] - 2011-11-24 EOP-001-AB-2b SCCR Reply Document for Filing - Final
- 2011-11-24 EOP-001-AB-2b ARS for Filing
-
Notice of Filing - Final Proposed New Resource and Demand Balancing ("BAL") Reliability Standards Definitions ("Final Proposed New BAL Reliability Standards Definitions")
[Posted: November 23, 2011] - 2011-11-23 New BAL 002 Reliability Standards Definitions - Blackline
- 2011-11-23 New BAL 002 Reliability Standards Definitions - Clean
-
Notice of Filing - Final Proposed Alberta Reliability Standard: Resource and Demand Balancing Contingency Reserves BAL-STD-002-AB-0 ("Final Proposed BAL-STD-002-AB-0")
[Posted: November 23, 2011] - 2011-11-23 ARS BAL-STD-002-AB-0 Final
-
Notice of Filing - Final Proposed Alberta Reliability Standard: Resource and Demand Balancing Disturbance Control Performance BAL-002-AB-1 ("Final Proposed BAL-002-AB-1")
[Posted: November 23, 2011] - 2011-11-23 ARS BAL-002-AB-1 FINAL
-
Notice of Filing - Final Proposed New Resource and Demand Balancing ("BAL") Reliability Standards Definitions ("Final Proposed New BAL Reliability Standards Definitions")
[Posted: November 22, 2011] - 2011-11-22 New BAL 004 Definitions - Blacklined
- 2011-11-22 New BAL 004 Definitions - Clean
-
Notice of Filing - Final Proposed Alberta Reliability Standard: Resource and Demand Balancing Automatic Time Error Correction BAL-004-WECC-AB-1 ("Final Proposed BAL-004-WECC-AB-1")
[Posted: November 22, 2011] - BAL-004-WECC-AB-01 ARS Final
-
Notice of Filing - Final Proposed Alberta Reliability Standard: Resource and Demand Balancing Time Error Correction BAL-004-AB-1 ("Final Proposed BAL-004-AB-1")
[Posted: November 22, 2011] - 2011-11-22 BAL-004-AB-01 ARS Final
-
Notice of Filing - Proposed "Package 11" New, Amended and Removed Reliability Standard Definitions ("Final Proposed Reliability Standards Definition Changes")
[Posted: November 22, 2011] - 2011-11-22 Package 11 filing - Blacklined
- 2011-11-22 Package 11 filing - Clean
-
AESO Reply to Stakeholder Comments on Consultation for Proposed Alberta Reliability Standard: Resource and Demand Balancing Contingency Reserves BAL-STD-002-AB-0 ("BAL-STD-002-AB-0")
[Posted: November 3, 2011] - 2011-11-03 AESO Reply Matrix (BAL-STD-002) Final
- 2011-11-03 ARS BAL-STD-002-AB-0 Nov12011vs
-
AESO Reply to Stakeholder Comments on Second Consultation on Proposed Alberta Reliability Standard: Resource and Demand Balancing Disturbance Control Performance BAL-002-AB-1 ("BAL-002-AB-1 Draft 2.1")
[Posted: November 3, 2011] - 2011-11-03 AESO Reply Matrix (BAL-002 2nd Consult) Final
- 2011-11-03 ARS BAL-002-AB-1 Nov12011vs
October
-
Stakeholder Comments on Consultation on Proposed New Protection and Control ("PRC") Reliability Standard Definition ("New PRC Reliability Standard Definition")
[Posted: October 25, 2011] - 2011-09-27_Comment-Rationale_-_Definitions_(prc-018) AML Comments
- 2011-09-27_Comment-Rationale_-_Definitions_prc-018 ATCO Power
- 2011-10-20_Comment-Rationale_-_Definitions_(prc-018)ENMAX
-
Stakeholder Comments on Second Consultation on Proposed Alberta Reliability Standard: Protection and Control Transmission Relay Loadability PRC-023-AB-1 ("PRC-023-AB-1 Draft 2.1")
[Posted: October 25, 2011] - PRC-023-AB-1_SCCR_(2nd_consultation)_-_Final AML Comments
- PRC-023-AB-1_SCCR_(2nd_consultation)_-_ATCO Power Comments (2)
- PRC-023-AB-1 (2nd Consult) Comments - Capital Power
- PRC-023-AB-1_SCCR_(2nd_consultation)ENMAX
- PRC-023-AB-1_SCCR_(2nd_consultation) EPCOR comments
- PRC-023-AB-1_SCCR__2nd_consultation__-_Suncor
-
Stakeholder Comments on Second Consultation on Proposed Alberta Reliability Standard: Protection and Control Disturbance Monitoring Equipment Installation and Data Reporting PRC-018-AB-1 ("PRC-018-AB-1 Draft 2.1")
[Posted: October 25, 2011] - PRC-018-AB-1 (2nd consult)_SCCR_-_Final AML Comments
- PRC-018-AB-1 (2nd consult)_SCCR_-_ATCO Electric Final
- PRC-018-AB-1 (2nd consult)_ATCO Power Comments
- PRC-018-AB-1 (2nd consult) Comments - Capital Power
- PRC-018-AB-1 (2nd consult)_SCCR_-_ENMAX Final
- PRC-018-AB-1 (2nd consult)_EDTI comments
- PRC-018-AB-1 (2nd consult)_SCCR_-_TransAlta comments
- TCE Comments PRC-018-AB-1 (2nd consult)_SCCR
-
AESO Reply to Stakeholder Comments on Proposed "Package 11" New, Amended and Removed Reliability Standard Definitions ("Reliability Standards Definition Changes")
[Posted: October 20, 2011] - 2011-10-20 (Pkg 11 Defns) blacklined clean - Final
- 2011-10-20 AESO Reply Matrix (Pkg 11 Defns) Final
-
Stakeholder Comments on Consultation for Proposed Alberta Reliability Standard: Resource and Demand Balancing "Contingency Reserves" BAL-STD-002-AB-0 ("BAL-STD-002-AB-0")
[Posted: October 18, 2011] - 2011-09-27_BAL-STD-002-AB-0 Comments ATCO Power
-
Stakeholder Comments on Consultation on Proposed Alberta Reliability Standard: Resource and Demand Balancing "Disturbance Control Performance" BAL-002-AB-1 ("BAL-002-AB-1 Draft 2.1")
[Posted: October 18, 2011] - 2011-09-27__BAL-002-AB-1 Comments ATCO Power
-
Stakeholder Comments on Consultation for Proposed Alberta Reliability Standard: Emergency Preparedness and Operations "Emergency Operations Planning" EOP-001-AB-2 (previously consulted on as EOP-001-AB-1 ("EOP-001-AB-2")
[Posted: October 18, 2011] - EOP-001-AB-2 comments ATCO Power
- EOP-001-AB-2 CPC Comments
- ENMAX Comments on_EOP-001-AB-2
- EOP-001-AB-2_EDTI comments
- EOP-001-AB-2_Nexen Comments
- Suncor-EOP-001-AB-2_SCCR
- EOP-001-AB-2_SCCR_TransAlta_2011_10_07
-
Alberta Reliability Standards Stakeholder Information Session Presentation - October 11, 2011
[Posted: October 11, 2011] -
Drafting Alberta Reliability Standard CIP-002
[Posted: October 5, 2011]
September
-
Second Consultation on Proposed Alberta Reliability Standard: Protection and Control "Transmission Relay Loadability" PRC-023-AB-1 ("PRC-023-AB-1 Draft 2.1")
[Posted: September 28, 2011] - 2011-09-28 PRC-023-AB-1 SCCR (2nd consultation) - Final
-
AESO Reply to Stakeholder Comments on Protection and Control ("PRC") Reliability Standard Proposed for Adoption as Alberta Reliability Standard: a) PRC-023-AB-1 Transmission Relay Loadability and b) New Definition
[Posted: September 28, 2011] - 2011-09-28 DRAFT 2 PRC-023-AB-1 SCCR Reply document
-
Stakeholder Consultation on Proposed New Protection and Control ("PRC") Reliability Standard Definition ("New PRC Reliability Standard Definition")
[Posted: September 27, 2011] - 2011-09-27 Comment-Rationale - Definitions (prc-018)
-
Second Consultation on Proposed Alberta Reliability Standard: Protection and Control "Disturbance Monitoring Equipment Installation and Data Reporting" PRC-018-AB-1 ("PRC-018-AB-1 Draft 2.1")
[Posted: September 27, 2011] - 2011-09-27 PRC-018-AB-1 SCCR - Final
- 2011-09-27 DME locations - Final
-
AESO Reply to Stakeholder Comments on proposed Protection and Control ("PRC") Alberta Reliability Standard: a) PRC-018-AB-1 Disturbance Monitoring Equipment Installation and Data Reporting and b) New Definition
[Posted: September 27, 2011] - 2011-09-27 PRC-018-AB-1 DRAFT 2 SCCR Reply Document
-
Stakeholder Consultation for Proposed Alberta Reliability Standard: Resource and Demand Balancing "Contingency Reserves" BAL-STD-002-AB-0 ("BAL-STD-002-AB-0")
[Posted: September 27, 2011] - 2011-09-27 BAL-STD-002-AB-0 SCCR for consultation - Final
-
Second Consultation on Proposed Alberta Reliability Standard: Resource and Demand Balancing "Disturbance Control Performance" BAL-002-AB-1 ("BAL-002-AB-1 Draft 2.1")
[Posted: September 27, 2011] - 2011-09-27 Comment and Reply Matrix for BAL-002-AB-0
- 2011-09-27 BAL-002-AB-1 SCCR for reconsult - Final
-
Stakeholder Consultation on Proposed New Resource and Demand Balancing ("BAL") Reliability Standard Definitions ("New BAL Reliability Standards Definitions")
[Posted: September 27, 2011] - 2011-09-27 BAL 002 Defns Comment-Rationale
-
Alberta Reliability Standards Stakeholder Session - October 11, 2011
[Posted: September 20, 2011] -
2011-09-12 Notice of Filing (FAC-014-AB-2) Final
[Posted: September 13, 2011] - 2011-03-18 Letter of Notice (FAC-014)
- 2011-04-21 SH Comment Letter (FAC-014)
- 2011-03-18 Letter of Notice (FAC-014)
- 2011-04-21 SH Comment Letter (FAC-014)
- 2011-08-11 AESO Reply (FAC-014)
- 2011-09-12 Final Proposed FAC-014-AB-2 ARS
-
2011-09-12 Notice of Filing (FAC-011-2) Final
[Posted: September 13, 2011] - 2011-03-18 Letter of Notice (FAC 011 Reject)
- 2011-04-21 SH Comment Letter (FAC-011-2)
- 2011-08-11 AESO Reply (FAC-011)
- 2011-03-18 Letter of Notice (FAC 011 Reject)
- 2011-04-21 SH Comment Letter (FAC-011-2)
- 2011-08-11 AESO Reply (FAC-011)
- 2011-09-12 FAC-011-2
-
2011-09-12 Notice of Filing (FAC-010-AB-2-1) Final
[Posted: September 13, 2011] - 2011-04-28 Letter of Notice (FAC-010)
- 2011-06-02 SH Comment Letter (FAC-010)
- 2011-08-11 AESO Reply _FAC-010
- 2011-04-28 Letter of Notice (FAC-010)
- 2011-06-02 SH Comment Letter (FAC-010)
- 2011-08-11 AESO Reply _FAC-010
- 2011-09-12 Final Proposed FAC-010-AB-2-1 ARS
-
2011-09-13 Letter of Notice (EOP-001-AB-2)
[Posted: September 13, 2011] - 2011-09-13 EOP-001-AB-1 Reply Matrix
- 2011-09-13 EOP-001-AB-2 SCCR
-
Stakeholder Consultation for Proposed Alberta Reliability Standard: Resource and Demand Balancing Automatic Time Error Correction BAL-004-WECC-AB-1. ("BAL-004-WECC-AB-1")
[Posted: September 8, 2011] - 2011-09-08 BAL-004-WECC-AB-01 SCCR
-
Stakeholder Consultation for Proposed Alberta Reliability Standard: Resource and Demand Balancing Time Error Correction BAL-004-AB-1. ("BAL-004-AB-1")
[Posted: September 8, 2011] - 2011-09-08 Final DRAFT BAL-004-AB-01 SCCR
-
Stakeholder Consultation on Proposed New Resource and Demand Balancing ("BAL") Reliability Standard Definitions ("New BAL Reliability Standards Definitions")
[Posted: September 8, 2011] - 2011-09-08 BAL Definitions Comment-Rationale
August
-
Stakeholder Comments on Consultation for Proposed “Package 11” New, Amended and Removed Reliability Standard Definitions (“Reliability Standards Definition Changes”)
[Posted: August 23, 2011] - ATCO Electric Comment-Rationale_(Pkg_11_ARS)_Final
- CPC Comments Pkg 11 definitions
-
AESO Reply to Stakeholder Comments on Consultation for Proposed Alberta Reliability Standard: Facilities Design, Connections and Maintenance "Establish and Communicate System Operating Limits" FAC-014-AB-2 ("FAC-014-AB-2")
[Posted: August 11, 2011] - 2011-08-11 FINAL DRAFT FAC-014-AB-2 ARS
-
AESO Reply to Stakeholder Comments on Consultation for proposed rejection of NERC Reliability Standard: Facilities Design, Connections and Maintenance "System Operating Limits Methodology for the Operations Horizon" FAC-011-2 ("NERC FAC-011-2")
[Posted: August 11, 2011] - 2011-08-11 FAC-011-2
-
AESO Reply to Stakeholder Comments on Consultation for Proposed Alberta Reliability Standard: Facilities Design, Connections and Maintenance "System Operating Limits Methodology fo rthe Planning Horizon" FAC-010-AB-2.1 ("FAC-010-AB-2.1")
[Posted: August 11, 2011] - 2011-08-11 FINAL DRAFT FAC-010-AB-2.1 ARS
-
Stakeholder Consultation on Proposed "Package 11" New, Amended and Removed Reliability Standard Definitions ("Reliability Standards Definition Changes")
[Posted: August 4, 2011] - 2011-08-04 Comment-Rationale (Pkg 11 ARS) Final
June
May
-
Alberta Reliability Standards Stakeholder Information Session Presentation - May 3, 2011
[Posted: May 10, 2011]
April
-
Stakeholder Consultation for Proposed Alberta Reliability Standard: Facilities Design, Connections and Maintenance “System Operating Limits Methodology for the Planning Horizon” FAC-010-AB-2.1(“FAC-010-AB-2.1”)
[Posted: April 28, 2011] - FAC-010-AB-2 SCCR for Stakeholder Consultation
-
Stakeholder Comments on Consultation for Proposed Alberta Reliability Standard: Facilities Design, Connections and Maintenance “Establish and Communicate System Operating Limits” FAC-014-AB-2
[Posted: April 21, 2011] - FAC014_Standards_-_AltaLink_Comments_word97
- ENMAX FAC-014 Comment Matrix
-
Stakeholder Comments on Consultation for Proposed Rejection of NERC Reliability Standard:Facilities Design, Connections and Maintenance “System Operating Limits Methodology for the Operations Horizon” FAC-011-2.
[Posted: April 21, 2011] - FAC_Standards_-_AltaLink_Comments_word97
- ENMAX FAC-011 Comment Matrix
-
Alberta Reliability Standards Stakeholder Session Invitation - May 3, 2011
[Posted: April 11, 2011]
March
-
Stakeholder Consultation on FAC-014-AB-2 "Establish and Communicate System Operating Limits" Proposed for Adoption as Alberta Reliability Standard
[Posted: March 18, 2011] - FAC-014-AB-2 SCCR for Stakeholder Consultation
-
Stakeholder Consultation on FAC-011-2 "System Operating Limits Methodology for the Operations Horizon" Proposed for Rejection as an Alberta Reliability Standard
[Posted: March 18, 2011] - FAC-011-2 SCCR for Stakeholder Consultation
- 2011-03-18 FAC-011-2
November
-
Notice of Filing - MOD-008-0 Documentation and Content of Each Regional TRM Methodology Proposed for Rejection as an Alberta Reliability Standard (the "NERC Standard")
[Posted: November 9, 2010] - 2010-11-09 MOD-008-0
-
Stakeholder Commnets on Letter of Notice - COM-002-AB-2 Communications and Coordination
[Posted: November 2, 2010] - COM-002-AB-2 AltaLink
- COM-002-AB-2 ATCO Electric
- ATCO Power COM-002-AB-2
- COM-002-AB-2 CPC Comments
- COM-002-AB-2 EDTI
- ENMAX COM-002 Comment Matrix
- COM-002-AB-2 TransAlta Comments
-
Stakeholder Comments on Letter of Notice - COM-001-AB-1.1 Telecommunications
[Posted: November 2, 2010] - COM-001-AB-1 AltaLink
- COM-001-AB-1 ATCO Electric
- COM-001-AB-1 EDTI
- ENMAX COM-001 Comment Matrix
- COM-001TransAlta comments
October
-
AESO Reply to Stakeholder Comments - MOD-008-0 Documentation and Content of Each Regional TRM Methodology
[Posted: October 21, 2010] - 2010-10-21 MOD-008-0
-
Stakeholder Comments on Letter of Notice - MOD-029-AB-1
[Posted: October 7, 2010] - MOD-029-AB-1TransAlta comments
September
-
Letter of Notice – COM-001-AB-1.1 Telecommunications
[Posted: September 30, 2010] - COM-001-AB-1 SCCR for Stakeholder Consultation
-
Letter of Notice – COM-002-AB-2 Communications and Coordination
[Posted: September 30, 2010] - COM-002-AB-2 SCCR for Stakeholder Consultation
-
Notice of Filing - North American Electric Reliability Corporation ("NERC") Reliability Standards Proposed for Rejection as Alberta Reliability Standards: a) MOD-011-0 b) MOD-028-1 c) MOD-030-1 d) IRO-004-2 and e) PER-002-0
[Posted: September 30, 2010] - 2010-09-30 MOD-011-0
- 2010-09-30 MOD-028-1
- 2010-09-30 MOD-030-1
- 2010-09-30 IRO-004-2
- 2010-09-30 PER-002-0
-
Stakeholder Comments on Letter of Notice - PRC-008-AB-0
[Posted: September 21, 2010] - PRC-008-AB-0_SCCR AltaLink
- PRC-008-AB-1 ATCO Electric Comments
- PRC-008 ENMAX Comment Matrix (2)
- EPCOR additional comments re PRC-008-AB-1
- EPCOR comments re PRC-008-AB-1
- PRC-008-AB-1 Suncor Comments
- PRC-008-AB-0 TransAlta comments
- PRC-008-AB-0 TransCanada Comments
-
Stakeholder Comments on Letter of Notice - MOD-024&-025-AB-1
[Posted: September 21, 2010] - MOD-024and025-AB-1 ATCO Power Comments
- MOD-024and025-AB-1_CPC Comments
- MOD-024-025 ENMAX Comment Matrix (2)
- MOD-024and025-AB-1 Suncor Comments
- MOD-024and025-AB-1 TransAlta coments
- MOD-024025-AB-1 TransCanada Comments
-
Stakeholder Comments on Letter of Notice: IRO-001-AB-1
[Posted: September 21, 2010] - IRO-001 ENMAX Comment Matrix (2)
-
Stakeholder Comments on Letter of Notice - PER-005-AB-1 System Personnel Training
[Posted: September 9, 2010] - PER-005-AB-1 AltaLink
- PER-005 ENMAX Comment Matrix
- PER-005-AB-1 EPCOR comments
- PER-005-AB-1 Nexen Inc Comments
- PER-005-AB-1 Suncor Energy Comments
- PER-005-AB-1TransAlta comments final
- PER-005-AB-1 TCE Comments
-
Stakeholder Comments on Letter of Notice - PER-003-AB-0 Operating personnel Credentials
[Posted: September 9, 2010] - PER-003-AB-0 AltaLink
- PER-003 ENMAX Comment Matrix
- PER-003 ENMAX follow-up email
- PER-003-AB-0 EPCOR Comments
- PER-003-AB-0 Nexen Inc Comments
- PER-003-AB-0 Suncor Energy Comments
- PER-003-AB-0 TransAlta comments final
- PER-003-AB-0 TCE Comments
-
Stakeholder Comments on Letter of Notice - IRO-005-AB-3 Reliability Coordination Current Day Operations
[Posted: September 9, 2010] - IRO-005-AB-3 AltaLink
- IRO-005-AB-3 CPC Comments
- IRO-005 ENMAX Comment Matrix
- IRO-005-AB-3 Nexen Inc Comments
- IRO-005-AB-3 Suncor Energy Comments
- IRO-005-AB-3 TransAlta comments Final
- IRO-005-AB-3 TCE Comments
-
Letter of Notice - MOD-029-AB-1 Rated System Path Methodology
[Posted: September 2, 2010] - MOD-029-AB-1 SCCR for Stakeholder Consultation
August
-
Stakeholder Comments on Letter of Notice – Protection and Control (“PRC”) Reliability Standard Proposed for Adoption as Alberta Reliability Standard: a) PRC-011-AB-0 UVLS Maintenance and Testing
[Posted: August 31, 2010] - PRC-011-AB-0 AltaLink
- PRC-011-AB-0_CPC Comments
- 2010-08-27 PRC-011-AB-0 Nexen Inc Comments
- PRC-011-AB-0 Suncor Comments
- 20100827 PRC-011-AB-0 TCE Comments
-
Stakeholder Comments on Letter of Notice – Protection and Control (“PRC”) Reliability Standard Proposed for Adoption as Alberta Reliability Standard: a) PRC-015-AB-0 Remedial Action Scheme Data and Documentation
[Posted: August 31, 2010] - PRC-015-AB-0 AltaLink
- 2010-08-10 ATCO PRC-015 Comments
- PRC-015-AB-0_CPC Comments
- PRC-015 ENMAX Comment Matrix
- 2010-08-23 Imprial Oil Comments - PRC015
- 2010-08-27 PRC-015-AB-0 Nexen Inc Comments
- PRC-015-AB-0 Suncor Comments
- PRC-015-AB-0 TransAlta comments
- 20100827 PRC-015-AB-0 TCE Comments
-
Stakeholder Comments on Letter of Notice – Protection and Control (“PRC”) Reliability Standard Proposed for Adoption as Alberta Reliability Standard: a) PRC-017-AB-0 Remedial Action Scheme Maintenance and Testing
[Posted: August 31, 2010] - PRC-017-AB-0 AltaLink
- PRC-017-AB-0_CPC Comments
- 2010-08-23 Imprial Oil Comments - PRC017
- 2010-08-27 PRC-017-AB-0 Nexen Inc Comments
- PRC-017-AB-0 Suncor Comments
- PRC-017-AB-0 TransAlta coments
- 20100827 PRC-017-AB-0 TCE Comments
-
Stakeholder Comments on Letter of Notice - Emergency Preparedness and Operations ("EOP") Reliability Standard Proposed for Adoption as Alberta Reliability Standard: a) EOP-008-AB-0 Plans for Loss of Control Centre Functionality
[Posted: August 31, 2010] - EOP-008-AB-0 AltaLink
- EOP-008 ENMAX Comment Matrix
- 2010-08-23 Imprial Oil Comments - EOP008
- 2010-08-27 EOP-008-AB-0 Nexen Inc Comments
- EOP-008-AB-0 Suncor Comments
- EOP-008-AB-0 TransAlta_comments final
- 20100827 EOP-008-AB-0 TCE Comments
-
Notice of Filing - Proposed Amendments to the Interpretation Section of Alberta Reliability Standards ("Interpretation Section Changes")
[Posted: August 24, 2010] - 2010-08-24 ARS Interpretation Final (clean)
- 2010-08-24 ARS Interpretation Final (blacklined)
-
Stakeholder Comments on Letter of Notice – Protection and Control (“PRC”) Reliability Standard Proposed for Adoption as Alberta Reliability Standard:a) PRC-023-AB-1 Transmission Relay Loadability and b) New Definition
[Posted: August 19, 2010] - PRC-023-AB-1 AltaLink Comments
- 2010-08-17 PRC-023-AB-1_Nexen Inc Comments
- PRC-023-AB-1 Suncor Comments
- PRC-023-AB-1TransAlta comments final
- 20100813 PRC-023-AB-1 TransCanada Comments
-
Stakeholder Comments on Letter of Notice – Protection and Control (“PRC”) Reliability Standard Proposed for Adoption as Alberta Reliability Standard:a) PRC-018-AB-1 Disturbance Monitoring Equipment installation and Data Reporting and b) New Definition
[Posted: August 19, 2010] - PRC-018-AB-1 AltaLink comments
- PRC-018-AB-1 CPC Comments
- 2010-08-17 PRC-018-AB-1_Nexen Comments
- PRC-018-AB-1 Suncor Comments
- PRC-018-AB-1 TransAlta comments final
- 20100813 PRC-018-AB-1 TransCanada Comments
-
Stakeholder Comments on Letter of Notice – Protection and Control (“PRC”) Reliability Standard Proposed for Adoption as an Alberta Reliability Standard:a) PRC-007-AB-0 Assuring Consistency with Regional Underfrequency Load Shedding Program Requirements
[Posted: August 19, 2010] - PRC-007-AB-1 AltaLink Comments
- PRC-007-AB-1 CPC Comments
- PRC-007 EPCs Comment Matrix
- 2008-08-17 PRC-007-AB-1 Nexen Inc Comments
- PRC-007-AB-1 Suncor Comments
- PRC-007-AB-1 TransAlta comments final
- 20100813 PRC-007-AB-1 TransCanada Comments
-
Letter of Notice - Modeling, Data, and Analysis ("MOD") Reliability Standard Proposed for Adoption as Alberta Reliability Standard: a) MOD-024&025-AB-1 Verification of Generator Real and Reactive Power Capability and b) New Definitions.
[Posted: August 17, 2010] - MOD-024and025-AB-1 SCCR for Stakeholder Consultation
-
Letter of Notice - Interconnection Reliability Operations and Coordination ("IRO") Reliability Standard Proposed for Adoption as Alberta Reliability Standard: a) IRO-001-AB-1 Reliability Coordination Responsibilities and Authorities and b) New Definition
[Posted: August 17, 2010] - IRO-001-AB-1 SCCR For Stakeholder Consultation
-
Letter of Notice - Protection and Control ("PRC") Reliability Standard Proposed for Adoption as Alberta Reliability Standard: a) PRC-008-AB-0 Underfrequency Load Shedding Equipment Maintenance Program (the "Proposed Reliability Standard")
[Posted: August 17, 2010] - PRC-008-AB-1_SCCR for Stakeholder Consultation
-
Stakeholder Comments on Letter of Notice - MOD-010&012-AB-0 Steady-State and Dynamic Data for Transmission System Modeling and Simulation Reliability Standard Proposed for Adoption as an Alberta Reliability Standard (the "Proposed Reliability Standard")
[Posted: August 12, 2010] - 2010-08-03 AltaLink Comments
- ATCO comments MOD 010 & 012 AB 0
- CPC Comments MOD-010012-AB-0
- 2010-08-05 ENMAX Comment Matrix (MOD-010and012)
- EPCOR Comments MOD-010012-AB-0
- 2010-08-06 Nexen Comments MOD-010_012-AB-0 final
- 2010-07-08 Suncor Comments MOD-010012-AB-0
- 2010-07-08 TransAlta MOD-010012-AB-0 final
- 2010-08-10 - TCE Comment Matrix - MOD-010 and 012
-
Letter of Notice - Personnel Performance, Training, and Qualifications ("PER") Reliability Standard Proposed for Adoption as Alberta Reliability Standard: a) PER-003-AB-0 Operating Personnel Credentials (the " Proposed Reliability Standard")
[Posted: August 5, 2010] - PER-003-AB-0 SCCR for stakeholder consultation
-
Letter of Notice - Personnel Performance, Training, and Qualifications ("PER") Reliability Standard Proposed for Adoption as Alberta Reliability Standard: a) PER-005-AB-1 System Personnel Training (the "Proposed Reliability Standard")
[Posted: August 5, 2010] - PER-005-AB-1 SCCR for stakeholder consultation
-
Letter of Notice - Interconnection Reliability Operations and Coordination ("IRO") Reliability Standard Proposed for Adoption as Alberta Reliability Standard: a) IRO-005-AB-3 Reliability Coordination Cuurent Day Operations
[Posted: August 5, 2010] - IRO-005-AB-3 SCCR for stakeholder consultation
-
AESO Reply to Stakeholder Comments - NERC Reliability Standards Proposed for Rejection as Alberta Reliability Standards a) MOD-011-0 b) MOD-028-1 c) MOD-030-1 d) IRO-004-2 and e) PER-002-0 ("collectively the "NERC Standards")
[Posted: August 5, 2010]
July
-
Stakeholder Comments on Letter of Notice - NERC Reliability Standards Proposed for Rejection as Alberta Reliability Standards: a) MOD-011-0 b) MOD-028-1 c) MOD-030-1 d) IRO-004-2 and e) PER-002-0
[Posted: July 26, 2010] - 2010-07-22 ENMAX Power Corp - Comment Matrix
-
Letter of Notice – Emergency Preparedness and Operations (“EOP”) Reliability Standard Proposed for Adoption as Alberta Reliability Standard: a) EOP-008-AB-0 Plans for Loss of Control Centre Functionality (the "Proposed Reliability Standard")
[Posted: July 22, 2010] - EOP-008-AB-0 SCCR for stakeholder consultation
-
Letter of Notice – Protection and Control (“PRC”) Reliability Standard Proposed for Adoption as Alberta Reliability Standard: a) PRC-017-AB-0 Remedial Action Scheme Maintenance and Testing (the "Proposed Reliability Standard")
[Posted: July 22, 2010] - PRC-017-AB-0_SCCR_for stakeholder consultation
-
Letter of Notice - Protection and Control ("PRC") Reliability Standard Proposed for Adoption as Alberta Reliability Standard: a) PRC-011-AB-0 UVLS Maintenance and Testing (the "Proposed Reliability Standard")
[Posted: July 22, 2010] - PRC-011-AB-0 SCCR for stakeholder consultation
-
Letter of Notice - Protection and Control ("PRC") Reliability Standard Proposed for Adoption as Alberta Reliability Standard: a) PRC-015-AB-0 Remedial Action Scheme Data and Documentation (the "Proposed Reliability Standard")
[Posted: July 22, 2010] - PRC-015-AB-0 SCCR for stakeholder consultation
-
AESO Reply to Stakeholder Comments - Proposed Amendments to the Interpretation Section of Alberta Reliability Standards ("Interpretation Section Changes")
[Posted: July 22, 2010] - 2010-07-22 ARS Interpretation Final (blacklined)
- 2010-07-22 ARS Interpretation Final (clean)
-
Letter of Notice - North American Electric Reliability Corporatiion ("NERC") Modeling, Data, and Analysis ("MOD") Reliability Standard Proposed for Rejection as an Alberta Reliability Standard: a) MOD-008-0
[Posted: July 15, 2010] - MOD-008-0_SCCR_for Stakeholder Consultation
- 2010-07-15 MOD-008-0
-
Letter of Notice - Protection and Control ("PRC") Reliability Standard Proposed for Adoption as Alberta Reliability Standard: a) PRC-023-Ab-1 Transmission Relay Loadability b) New Definition
[Posted: July 15, 2010] - PRC-023-AB-1 SCCR for Stakeholder Consultation
-
Letter of Notice - Protection and Control ("PRC") Reliability Standard Proposed for Adoption as Alberta Reliability Standard: a) PRC-018-AB-1 Disturbance Monitoring Equipment Installation and Data Reporting b) New Definition
[Posted: July 15, 2010] - Stakeholder Comparison Comment Rationale Matrix for PRC-018-AB-1
-
Letter of Notice - Protection and Control ("PRC") Reliability Standard Proposed for Adoption as an Alberta Reliability Standard: a) PRC-007-AB-0 Assuring Consistency with Regional Underfrequency Load Shedding Program Requirements
[Posted: July 15, 2010] - Stakeholder Comparison Comment Rationale Matrix
-
Stakeholder Comments on Letter of Notice - Voltage and Reactive ("VAR") Reliability Standards Proposed for Adoption as Alberta Reliability Standards: a) New Definitions b) VAR-001-AB-1a c) VAR-002-AB-1.1b d) VAR-002-WECC-AB-1 and e) VAR-501-WECC-AB-1
[Posted: July 14, 2010] - TransCanada Comments VAR
- TransAlta VAR-501-WECC-AB-1-comments
- TransAlta VAR-002-WECC-AB-1-comments
- TransAlta VAR-002-AB-1 1b comments
- TransAlta VAR-001-AB-1 comments
- Suncor Email - VAR
- Suncor comments_VAR-501-WECC-AB-1-SCR
- Suncor comments_VAR-002-AB-1.1b-SCR
- Suncor comments_VAR-001-AB-1a-SCR
- Nexen Inc Comments VAR-501-WECC-AB-1-SCR
- Nexen Inc Comments VAR-002-WECC-AB-1-SCR
- Nexen Inc Comments VAR-002-AB-1 1b-SCR
- Nexen Inc Comments VAR-001-AB-1a-SCR
- EPCOR Comments VAR-001-AB-1a-SCR
- Captial Power Comments VAR-501-WECC-AB-1
- Captial Power Comments VAR-002-AB-1
- Capital Power Comments VAR-002-WECC-AB-1
- ATCO Comments VAR reliatilby standards
- ATCO Comment VAR-501-WECC-AB-1-SCR
- ATCO Comment VAR-002-WECC-AB-1-SCR
- ATCO Comment VAR-002-AB-1.1b-SCR
-
Letter of Notice - MOD-010&012-AB-0 Steady-State and Dynamic Data for Transmission System Modeling and Simulation Reliability Standard Proposed for Adoption as an Alberta Reliability Standard (the "Proposed Reliability Standard")
[Posted: July 8, 2010] - 2010-07-08 MOD-010012-AB-0 SCCR
June
-
Letter of Notice - Proposed Amendments to the Interpretation Section of Alberta Reliability Standards
[Posted: June 25, 2010] - ARS Interpretation (blacklined) v1
- ARS Interpretation (clean) v1
- 2010-06-25 Interpretation - SH Comment and Rationale
-
Alberta Reliability Standards Stakeholder Session Presentation - June 15, 2010
[Posted: June 17, 2010] -
Letter of Notice - NERC Reliability Standards Proposed for Rejection as Alberta Reliability Standards: a) MOD-011-0 b) MOD-028-1 c) MOD-030-1 d) IRO-004-2 e) PER-002-0
[Posted: June 17, 2010] - 2010-06-17 MOD-011-0
- 2010-06-17 MOD-028-1
- 2010-06-17 MOD-030-1
- 2010-06-17 IRO-004-2
- 2010-06-17 PER-002-0
- 2010-06-17 NA-SCR-master
-
Letter of Notice - Voltage and Reactive ("VAR") Reliability Standards Proposed for Adoption as Alberta Reliability Standards: a) New Definitions b) VAR-001-AB-1a b) VAR-002-AB-1.1b c) VAR-002-WECC-AB-1 and d) VAR-501-WECC-AB-1
[Posted: June 11, 2010] - 2010-06-11 VAR-001-1
- 2010-06-11 VAR-001-AB-1a CD (DRAFT 2)
- 2010-06-11 VAR-001-AB-1a-SCR
- 2010-06-11 VAR-002-1_1b
- 2010-06-11 VAR-002-AB-1 1b CD (DRAFT 2)
- 2010-06-11 VAR-002-AB-1.1b-SCR
- 2010-06-11 VAR-002-WECC-1_Final
- 2010-06-11 VAR-002-WECC-AB-1 CD (DRAFT 2)
- 2010-06-11 VAR-002-WECC-AB-1-SCR
- 201-06-11 VAR-501-WECC-1_Final
- 2010-06-11 VAR-501-WECC-AB-1 CD (DRAFT 2)
- 2010-06-11 VAR-501-WECC-AB-1-SCR
May
-
Invitation to Stakeholder Session
[Posted: May 27, 2010]
December
-
Notice of Filing - Recommended Transmission Operations ("TOP") Alberta Reliability Standards ("Reliability Standards") and Updated Alberta Reliability Standards Glossary of Terms ("Updated Glossary"): a) TOP-007-WECC-AB-1 b) Updated Glossary
[Posted: December 8, 2009] - Final Draft TOP-007-WECC-AB-1 Filed with Commission
- TOP-007-WECC-AB-1 Filed Comparison Document
- Final Draft TOP-007-WECC-AB-1 Defined Terms Filed with Commission (Clean)
- Final Draft TOP-007-WECC-AB-1 Defined Terms Filed with Commission (blacklined)
-
Notice of Filing - Recommended Protection and Control ("PRC") Alberta Reliability Standards ("Reliability Standards") and Updated Alberta Reliability Standards Glossary of Terms ("Updated Glossary")
[Posted: December 8, 2009] - FINAL DRAFT PRC-004-AB-1 Filed with Commission
- PRC-004-AB-1 Filed Comparison Document
- FINAL DRAFT PRC-004-WECC-AB-1 Filed with Commission
- PRC-004-WECC-AB-1 Filed Comparison Document
- FINAL DRAFT PRC-004 and PRC-004 WECC Defined Terms Filed with Commission (Clean)
- FINAL DRAFT PRC-004 and PRC-004 WECC Defined Terms Filed with Commission (blacklined)
-
Notice of Re-Filing - Proposed Critical Infrastructure Protection (CIP) Alberta Reliability Standard ("Reliability Standard") and Updated Alberta Reliability Standards Glossary of Terms ("Updated Glossary"): a) CIP-001-AB-1 b) Updated Glossary
[Posted: December 4, 2009] -
Notice of Re-Filing - Proposed Modeling, Data, and Analysis (MOD) Alberta Reliability Standards ("Reliability Standards") and Updated Reliability Standards Glossary of Terms ("Updated Glossary")
[Posted: December 4, 2009] -
Correction to Filed Alberta Reliability Standard ("Reliability Standard") IRO-006-WECC-AB-1 Qualified Transfer Path unscheduled Flow Relief (Application No. 1605677)
[Posted: December 4, 2009] - 2009-12-04-IRO-006-WECC-AB-1_RE-FILED clean
-
Notice of Re-Filing - Proposed Interconnection Reliability Operations and Coordination ('IRO"), Protection and Control ("PRC") Alberta Reliability Standards ("Reliability Standards") and Updated Alberta Reliability Standards Glossary of Terms
[Posted: December 4, 2009] -
Notice of Filing - Proposed Interconnection Reliability Operations and Coordination ("IRO"), Protection and Control ("PRC") Alberta Reliability Standards ("Reliability Standards") and Updated Alberta Reliability Standards Glossary of Terms
[Posted: December 1, 2009] - Updated Glossary of Terms (IRO and PRC) clean
- Updated Glossary of Terms (IRO and PRC) blacklined
- PRC-001-AB-1 FILED Comparison Document
- PRC-001-AB-1_FILED_clean
- IRO-006-WECC-AB-1 FILED Comparison Document
- IRO-006-WECC-AB-1_FILED_clean
-
Notice of Filing - Proposed Modeling, Data, and Analysis (MOD) Alberta Reliability Standards ("Reliability Standards") and Updated Alberta Reliability Standards Glossary of Terms ("Updated Glossary")
[Posted: December 1, 2009] - Updated Glossary of Terms (MOD) - FILED clean
- Updated Glossary of Terms (MOD) - FILED blacklined
- MOD-019-AB-0 Filed_FILED_clean
- MOD-019-AB-0 FILED Comparison Document
- MOD-018-AB-0 _FILED_clean
- MOD-018-0 FILED Comparison Document
- MOD-017-AB-0_1_FILED_clean
- MOD-017-AB-0_1 FILED Comparison Document
- MOD-016-AB-1_1_FILED_clean
- MOD-016-AB-1_1 FILED Comparison Document
-
Notice of Filing - Proposed Critical Infrastructure Protection (CIP) Alberta Reliability Standard ("Reliability Standard") and Updated Alberta Reliability Standards Glossary of Terms ("Updated Glossary"): CIP-001-AB-1 and Updated Glossary
[Posted: December 1, 2009] - Updated Glossary CIP (clean)
- Updated Glossary CIP (blacklined)
- CIP-001-1_FILED_(clean)
November
-
Revised Final Proposed Protection and Control ("PRC") Alberta Reliability Standards ("Reliability Standards"): PRC-004-AB-1 and PRC-004-WECC-AB-1
[Posted: November 25, 2009] -
Final Proposed Protection and Control ("PRC") Alberta Reliability Standards ("Reliability Standards"): PRC-004-AB-1 and PRC-004-WECC-AB-1
[Posted: November 20, 2009] - FINAL DRAFT PRC-004-WECC-AB-1 Comparison Document
- FINAL DRAFT PRC-004-AB-1 Comparison Document
- AESO Reply Matrix (PRC-004WECC) - 2009-11-20
- AESO Reply Matrix (PRC-004) - 2009-11-20
-
Final Proposed Transmission Operations (TOP) Alberta Reliability Standards ("Reliability Standards"): TOP-007-WECC-AB-1 System Operating Limits
[Posted: November 20, 2009] - FINAL DRAFT TOP-007-WECC-AB-1 Comparison Document
- AESO Reply Matrix TOP 007 - 2009-11-16
-
Revised Final Proposed Interconnection Reliability Operations and Coordination ("IRO") and Protection and Control ("PRC") Alberta Reliability Standards ("Reliability Standards"): IRO-006-WECC-AB-1 and PRC-001-AB-1
[Posted: November 18, 2009] - Revised AESO Response Matrix PRC_001-11-18-2009
-
Final Proposed Interconnection Reliability Operations and Coordination ("IRO") and Protection and Control ("PRC") Alberta Reliability Standards ("Reliability Standards"): IRO-006-WECC-AB-1 and PRC-001-AB-1
[Posted: November 16, 2009] - Final Draft PRC-001-AB-1 Comparison Document Submitted for Approval
- Final Draft IRO-006-WECC-AB-1 Comparison Document Submitted for Approval
- AESO Reply Matrix PRC-001-AB-1 2009-11-16
-
Final Proposed Modeling, Data, and Analysis (MOD) Alberta Reliability Standards ("Reliability Standards"): MOD-016-AB-1.1, MOD-017-AB-0.1, MOD-018-AB-0, and MOD-019-AB-0
[Posted: November 16, 2009] - Final Draft MOD-019-0 Comparison Document Submitted for Approval
- Final Draft MOD-018-0 Comparison Document Submitted for Approval
- Final Draft MOD-017-AB-0.1 Comparison Document Submitted for Approval
- Final Draft MOD-016-AB-1.1 Comparison Document Submitted for Approval
- AESO Reply Matrix MOD 016-019 - 2009-11-16
-
Final Proposed Critical Infrastructure Protection (CIP) Alberta Reliability Standard ("Reliability Standard")
[Posted: November 16, 2009] - Final Draft CIP-001-AB-1 Comparison Document Submitted for Approval
- AESO Reply Matrix CIP-001 - 2009-11-16
-
Notice of Filing - Proposed Level II New Interpretation Section for Alberta Reliability Standards ("Reliability Standards")
[Posted: November 16, 2009] - Interpretation - RS - Nov 16 2009
-
Notice of Filing - Reject NERC Interconnection Reliability Operations and Coordination (IRO) Reliability Standards and Nuclear (NUC) Reliability Standards for application in Alberta
[Posted: November 5, 2009] -
Notice of Filing - Reject NERC Modeling, Data and Analysis (MOD) Reliability Standards for application in Alberta
[Posted: November 5, 2009] - Alberta Reliability Standards Stakeholder Presentation
-
Alberta Reliability Standards Stakeholder Information Session - November 17, 2009
[Posted: November 4, 2009]
October
-
Final Proposed Level II New Interpretation Section for Alberta Reliability Standards ("Reliability Standards")
[Posted: October 29, 2009] - Rationale for Final Proposed New ARS Interpretation
- Stakeholder Comment AESO Reply Matrix - Reliability Standards Interpretation
-
Final Recommendation to Reject NERC Reliability Standards ("NERC Standards"): IRO-006-4 and NUC-001-1
[Posted: October 22, 2009] -
Final Recommendation to Reject NERC Reliability Standards ("NERC Standards"): MOD-002-0, MOD-003-0, MOD-004-1, MOD-005-0, and MOD-009-0
[Posted: October 22, 2009] -
Stakeholder Comments on Letter of Notice - Proposed Level II New Interpretation Section for Alberta Reliability Standards
[Posted: October 21, 2009] - Stakeholder Comment Matrix -ARS Interpretation
-
Stakeholder Comments on Letter of Notice – Proposed Alberta Reliability Standards (“Reliability Standards”): a) EOP-001-AB-1 Emergency Operations Planning b) CiP-001-AB-1 Sabotage Reporting
[Posted: October 15, 2009] - TransAlta Stakeholder Comment Matrix 2 - LI ARS Industry Oct 9 2009.pdf
- TransAlta Cover Letter CIP-001 and OPP 808 - Sept 30 2009
- Capital Power Comment Matrix - Sep 09 09 Package 1
- TransCanada Comments on CIP001 and OPP 808
- TransAlta CIP-001 and OPP 808 Stakeholder Comment Matrix 1 (LI ARS Industry).pdf
- IPPSA comments - CIP-001-1-EOP-001 - 09Oct2009
- ATCO Power RS Comment Matrix
-
Stakeholder Comments on Letter of Notice – Proposed Alberta Reliability Standards (“Reliability Standards”): MOD-016-AB-1.1, MOD-017-AB-0.1, MOD-018-AB-0, MOD-019-AB-0 and TOP-007-WECC-AB-1
[Posted: October 15, 2009] - IPPSA comments - MODs - 09Oct2009
- CPC Comment Matrix - Sep 09 09 Package 2
-
Proposed Level II New Interpretation Section for Alberta Reliability Standards (“Reliability Standards”)
[Posted: October 1, 2009] - Rationale Doc for Proposed New ARS Interpretation
- Stakeholder Comment Matrix (ARS - Interpretation)
September
-
Stakeholder Comments on Letter of Notice - Proposed Alberta Reliability Standards ("Reliability Standards")
[Posted: September 16, 2009] - TransAlta comments
- IPPSA Comments
- Capital Power Comments
- ATCO Power Comments
-
Letter of Notice - Proposal to Reject NERC Reliability Standards ("NERC Standards"): a) MOD-002-0 b) MOD-003-0 c) MOD-004-1 d) MOD-005-0 and e) MOD-009-0
[Posted: September 9, 2009] - Stakeholder Comment Matrix (Reject NERC Stds).
-
Letter of Notice - Proposed Alberta Reliability Standards ("Reliability Standards"): a) MOD-016-AB-1.1 b) MOD-017-AB-0.1 c) MOD-018-AB-0 d) MOD-019-AB-0 e) TOP-007-WECC-AB-1
[Posted: September 9, 2009] -
Stakeholder Comment Matrix (LI ARS AESO)
[Posted: September 9, 2009] - TOP-007-WECC-AB-1 Comparison Document
- MOD-019-0 Comparison Document
- MOD-018-0 Comparison Document
- MOD-017-AB-0.1 Comparison Document
- MOD-016-1.1 Comparison Document
-
Letter of Notice - Proposed Alberta Reliability Standards ("Reliability Standards") a) EOP-001-AB-1 and b) CIP-001-AB-1
[Posted: September 9, 2009] - Stakeholder Comment Matrix (LI_ARS Industry)
- EOP-001-AB-1 Comparison Document
- CIP-001-1 Comparison Document
August
-
Notice of Filing – Reject NERC Reliability Standards (“NERC Standards”) for application in Alberta
[Posted: August 24, 2009] -
Alberta Reliability Standards - FAQ from May 21, 2009 Stakeholder Meeting
[Posted: August 24, 2009] -
Notice of Filing – Alberta Reliability Standards (“Reliability Standards”)
[Posted: August 17, 2009] - Comparison Document between NERC TPL-004-0 and Alberta TPL-004-AB-0
- TPL-004-AB-0
- Comparison Document between NERC TPL-003-0 and Alberta TPL-003-AB-0
- TPL-003-AB-0
- Comparison Document between NERC TPL-002-0 and Alberta TPL-002-AB-0
- TPL-002-AB-0
- Comparison Document between NERC TPL-001-0 and Alberta TPL-001-AB-0
- TPL-001-AB-0
- Comparison Document between NERC PRC-022-1 and Alberta PRC-022-AB-1
- PRC-022-AB-1
- Comparison Document between NERC PRC-010-0 and Alberta PRC-010-AB-0
- PRC-010-AB-0
- Comparison Document between NERC PRC-009-0 and Alberta PRC-009-AB-0
- PRC-009-AB-0
- Comparison Document between NERC INT-010-1 and Alberta INT-010-AB-1
- INT-010-AB-1
- Comparison Document between NERC INT-009-1 and Alberta INT-009-AB-1
- INT-009-AB-1
- Comparison Document between NERC INT-006-2 and Alberta INT-006-AB-2
- INT-006-AB-2
- Comparison Document between NERC INT-001-3 and Alberta INT-001-AB-3
- INT-001-AB-3
- Comparison Document between NERC FAC-002-0 and Alberta FAC-002-AB-0
- FAC-002-AB-0
- Comparison Document between NERC FAC-001-0 and Alberta FAC-001-AB-0
- FAC-001-AB-0
- Comparison Document between NERC EOP-002-2 and Alberta EOP-002-AB-2
- EOP-002-AB-2
-
Proposal to Reject NERC Reliability Standards (“NERC Standards”): a) IRO-006-4 Reliability Coordination – Transmission Loading Relief b) NUC-001-1 Nuclear Plant Interface Coordination
[Posted: August 13, 2009] - Stakeholder Comment Form
-
Proposed Alberta Reliability Standards: IRO-006-WECC-AB-1, PRC-001-AB-1, PRC-004-AB-1, PRC-004-WECC-AB-1, PRC-005-AB-1, PRC-016-AB-0
[Posted: August 13, 2009] - PRC-016-AB-0 Comparison Document
- PRC-005-AB-1 Comparison Document
- PRC-004-WECC-AB-1 Comparison Document
- PRC-004-AB-1 Comparison Document
- PRC-001-AB-1 Comparison Document
- IRO-006-WECC-AB-1 Comparison Document
- Stakeholder Comment Form
-
Notice of Filing – Alberta Reliability Standards (“Reliability Standards”)
[Posted: August 10, 2009] - Updated Glossary (clean)
- Updated Glossary (Blacklined)
- Comparison Document between WECC FAC-501-WECC-1 and Alberta FAC-501-WECC-AB-1
- FAC-501-WECC-AB-1
- Comparison Document between NERC PRC-021-1 and Alberta PRC-021-AB-1
- PRC-021-AB-1
-
Second Notice of Errata Filing – Alberta Reliability Standard BAL-001-AB-0a Real Power Balancing Control
[Posted: August 4, 2009] - Second Revised BAL-001-AB-0a
July
-
Notice of Errata Filing – Alberta Reliability Standard BAL-001-AB-0a Real Power Balancing Control
[Posted: July 28, 2009] - BAL-001-AB-0a-errata (Revised).pdf
- BAL-001-AB-0a_(As Filed).pdf
- BAL-001-0a (NERC).pdf
-
Final Proposed Alberta Reliability Standards
[Posted: July 24, 2009] - Stakeholder Comment Response JUL 2009 Process.doc
- ARS Glossary of Terms (clean).pdf
- ARS Glossary of Terms (blacklined).doc
- TPL-004-AB-0 FINAL DRAFT Comparison Document.pdf
- TPL-004-AB-0 FINAL DRAFT .doc
- TPL-003-AB-0 FINAL DRAFT Comparison Document.pdf
- TPL-003-AB-0 FINAL DRAFT .pdf
- TPL-002-AB-0 FINAL DRAFT Comparison Document.pdf
- TPL-002-AB-0 FINAL DRAFT .doc
- TPL-001-AB-0 FINAL DRAFT Comparison Document.pdf
- TPL-001-AB-0 FINAL DRAFT .pdf
- PRC-022-AB-1 FINAL DRAFT Comparison Document.pdf
- PRC-022-AB-1 FINAL DRAFT .pdf
- PRC-021-AB-1 FINAL DRAFT Comparison Document.pdf
- PRC-021-AB-1 FINAL DRAFT.pdf
- PRC-010-AB-0 FINAL DRAFT Comparison Document.pdf
- PRC-010-AB-0 FINAL DRAFT .pdf
- PRC-009-AB-0 FINAL DRAFT Comparison Document.pdf
- PRC-009-AB-0 FINAL DRAFT.pdf
- INT-010-AB-1 FINAL DRAFT Comparison Document.pdf
- INT-010-AB-1 FINAL DRAFT.pdf
- INT-009-AB-1 FINAL DRAFT Comparison Document.pdf
- INT-009-AB-1 FINAL DRAFT.pdf
- INT-006-AB-2 FINAL DRAFT Comparison Document.pdf
- INT-006-AB-2 FINAL DRAFT.pdf
- INT-001-AB-3 FINAL DRAFT Comparison Document.pdf
- INT-001-AB-3 FINAL DRAFT.pdf
- FAC-002-AB-0 FINAL DRAFT Comparison Document.pdf
- FAC-002-AB-0 FINAL DRAFT .pdf
- FAC-001-AB-0 FINAL DRAFT Comparison Document.pdf
- FAC-001-AB-0 FINAL DRAFT .pdf
- FAC-501-WECC-AB-1 FINAL DRAFT Comparison Document.pdf
- FAC-501-WECC-AB-1 FINAL DRAFT.pdf
- EOP-002-AB-2 FINAL DRAFT Comparison Document.pdf
- EOP-002-AB-2 FINAL DRAFT EOP-002-AB-2.pdf
-
Final Recommendation to Reject NERC Reliability Standards (“NERC Standards”)
[Posted: July 24, 2009]
June
-
Stakeholder Comments on Letter of Notice – Proposed Alberta Reliability Standards (“Reliability Standards”)
[Posted: June 9, 2009] - TransAlta_Comments1.pdf
- IPPSA Comments.pdf
- ATCO_POWER_Comments1.PDF
May
-
Alberta Reliability Standards Stakeholder Session May 21, 2009 - Presentation
[Posted: May 25, 2009] -
Alberta Reliability Standards - July Cycle of ISO Rules Process Supplemental Update
[Posted: May 20, 2009] -
Notice of Filing – Alberta Reliability Standards (“Reliability Standards”): EOP-003-AB-1 Load Shedding Plans; EOP-004-AB-1 Disturbance Reporting; Updated Alberta Reliability Standards Glossary of Terms (“Updated Glossary”)
[Posted: May 11, 2009] - Alberta_Reliability_Standards_Glossary_of_Terms_FILED_(Updated_blacklined).pdf
- Alberta_Reliability_Standards_Glossary_of_Terms_FILED_(Updated_clean).pdf
- EOP-003-AB-1_FILED_(clean).pdf
- EOP-003-AB-1_FILED_Comparison_Document.pdf
- EOP-004-AB-1_FILED_(clean).pdf
- EOP-004-AB-1_FILED_Comparison_Document.pdf
-
Stakeholder Notice Regarding Deferral of Filing with Alberta Utilities Commission Notice - Final Proposed ISO and OPP Rules Letters dated April 16 and 17, 2009 and Final Propose Alberta Reliability Standards Letter dated April 16, 2009
[Posted: May 7, 2009] -
Letter of Notice LI ARS May 1 2009
[Posted: May 1, 2009] - Stakeholder_Comment_Matrix_JUL_2009_LI_ARS.doc
-
Letter of Notice (LI RelStds Reject) May 1 2009
[Posted: May 1, 2009] - Stakeholder_Comment_Matrix_JUL_2009_LI_Reject_NS.doc
- Stakeholder_Comment_Matrix_JUL_2009_(LII_LIII_OPPs).doc
- OPP_1306_DRAFT2_(clean).pdf
- OPP_1306_DRAFT2_(blacklined).pdf
- OPP_807_DRAFT2_(clean).pdf
- OPP_807_DRAFT2_(blacklined).pdf
- OPP_803_DRAFT2_(clean).pdf
- OPP_803_DRAFT2_(blacklined).pdf
- OPP_802_DRAFT2_(clean).pdf
- OPP_802_DRAFT2_(blacklined).pdf
- OPP_603_DRAFT2_(clean).pdf
- OPP_603_DRAFT2_(blacklined).pdf
- OPP_601_DRAFT2_(clean) .pdf
- OPP_601_DRAFT2_(blacklined) .pdf
- OPP_503_DRAFT2_(clean).pdf
- OPP_503_DRAFT2_(blacklined).pdf
- OPP_401_DRAFT2_(clean).pdf
- OPP_401_DRAFT2_(blacklined).pdf
- OPP_312_DRAFT2_(clean).pdf
- OPP_312_DRAFT2_(blacklined).pdf
April
- TPL-004-AB-0_Comparison_Document_DRAFT_2.pdf
- TPL-003-AB-0_Comparison_Document_DRAFT_2.pdf
- TPL-002-AB-0_Comparison_Document_DRAFT_2.pdf
- TPL-001-AB-0_Comparison_Document_DRAFT_2.pdf
- Stakeholder_Comment_Matrix_JUL_2009_LI_ARS.pdf
- PRC-022-AB-1_Conversion_Document_DRAFT_2.pdf
- PRC-021-AB-1_Comparison_Document_DRAFT_2.pdf
- PRC-010-AB-0_Comparison_Document_DRAFT_2.pdf
- PRC-009-AB-0_Comparison_Document_DRAFT_2.pdf
- INT-010-AB-1_Comparison_Document_DRAFT_2.pdf
- INT-009-AB-1_Comparison_Document_DRAFT_2.pdf
- INT-006-AB-2_Comparison_Document_DRAFT_2.pdf
- INT-001-AB-3_Comparison_Document_DRAFT_2.pdf
- FAC-501-WECC-AB-1_Comparison_Document_DRAFT_2 .pdf
- FAC-002-AB-0_Comparison_Document_DRAFT_2.pdf
- FAC-001-AB-0_Comparison_Document_DRAFT_2.pdf
- EOP-002-AB-2_Comparison_Document_DRAFT_2.pdf
- BAL-002-WECC-AB-1_Comparison_Document_DRAFT_2.pdf
- BAL-002-AB-0_Comparison_Document_DRAFT_2_.pdf
- Stakeholder_Comment_Matrix_JUL_2009_LI_Reject_NS.pdf
-
Alberta Reliability Standards Stakeholder Information Session
[Posted: April 29, 2009] -
Final Proposed Alberta Reliability Standards (“Reliability Standards”): a) EOP-003-AB-1 Load Shedding Plans; b) EOP-004-AB-1 Disturbance Reporting; c) Updated Alberta Reliability Standards Glossary of Terms (“Updated Glossary”)
[Posted: April 16, 2009]
February
-
Notice of Decision to Reject NERC Reliability Standards (“NERC Standards”): IRO-002-1, IRO-003-2, IRO-014-1, IRO-015-1 and IRO-016-1
[Posted: February 19, 2009] -
Notice of Alberta Reliability Standard (“Reliability Standards”) Effective Date: a) BAL-001-AB-0a, b) BAL-003-AB-0a, c) BAL-006-AB-1 & d) Alberta Reliability Standards Glossary of Terms (“Glossary”)
[Posted: February 5, 2009] -
Notice of Alberta Reliability Standard (“Reliability Standards”) Effective Date: a) FAC-003-AB-1, b) TOP-005-AB-1, c) INT-003-AB-2 & d) Alberta Reliability Standards Glossary of Terms (“Glossary”)
[Posted: February 5, 2009]
January
-
Proposed Alberta Reliability Standards (“Reliability Standards”): a) EOP-003-AB-1 Load Shedding Plans, b) EOP-004-AB-1 Disturbance Reporting & c) Updated Alberta Reliability Standards Glossary of Terms (“Updated Glossary”)
[Posted: January 29, 2009] - EOP-004-AB-1_DRAFT_2_(clean)_Jan_29_2009.pdf
- EOP-003-AB-1_DRAFT_2_(clean)_Jan_29_2009.pdf
- Alberta_Reliability_Standards_Glossary_of_Terms_(Updated_clean)_Jan_29_2009.pdf
- Alberta_Reliability_Standards_Glossary_of_Terms_(Updated_blacklined)_Jan_29_2009.pdf
- Comparison_between_EOP-004-01_and_EOP-004-AB-1_DRAFT_2_Jan_29_2009.pdf
- Comparison_between_EOP-003-1_and_EOP-003-AB-1_DRAFT_2_Jan_29_2009.pdf
- Stakeholder_Comment_Matrix_APR_2009_LI_ARS.doc
December
-
Notice of Filing – Recommendation to Not Adopt NERC Reliability Standards : IRO-002-1, IRO-003-2, IRO-014-1, IRO-015-1, IRO-016-1
[Posted: December 17, 2008] -
Notice of Filing – Alberta Reliability Standards : BAL-001-AB-0a, BAL-003-AB-0a, BAL-006-AB-1, Updated Alberta Reliability Standards Glossary of Terms
[Posted: December 17, 2008] - IRO-016-1_(Jan_09_process).pdf
- IRO-015-1_(Jan_09_process).pdf
- IRO-014-1_(Jan_09_process).pdf
- IRO-003-2_(Jan_09_process).pdf
- IRO-002-1_(Jan_09_process).pdf
-
Amendment to Notice of Filing – Alberta Reliability Standards : FAC-003-AB-1, TOP-005-AB-1, INT-003-AB-2, Alberta Reliability Standards Glossary of Terms
[Posted: December 17, 2008] - Comparison_between_BAL-006-1_and_BAL-006-AB-1_Final_Draft.pdf
- Comparison_between_BAL-003-1_and_BAL-003-AB-1_Final_Draft.pdf
- Comparison_between_BAL-001-1_and_BAL-001-AB-1_Final_Draft.pdf
- BAL-006-AB-1_Final_DRAFT.pdf
- BAL-003-AB-0a_Final_DRAFT.pdf
- BAL-001-AB-0a_Final_DRAFT.pdf
- Alberta_Reliability_Standards_Glossary_of_Terms_(Updated_clean)_Dec_17_2008.pdf
- Alberta_Reliability_Standards_Glossary_of_Terms_(Updated_blacklined)_Dec_17_2008.pdf
- TOP-005-AB-1_RE-FILED_(clean)_Dec_17_2008.pdf
- TOP-005-AB-1_RE-FILED_(blacklined)_Dec_17_2008.pdf
- INT-003-AB-2_RE-FILED_(clean)_Dec_17_2008.pdf
- INT-003-AB-2_RE-FILED_(blacklined)_Dec_17_2008.pdf
- FAC-003-AB-1_RE-FILED_(clean)_Dec_17_2008.pdf
- FAC-003-AB-1_RE-FILED_(blacklined)_Dec_17_2008.pdf
- Comparison_between_TOP-005-1_and_TOP-005-AB-1_Final_Draft.pdf
- Comparison_between_INT-003-2_and_INT-003-AB-2_Final_Draft.pdf
- Comparison_between_FAC-003-1_and_FAC-003-AB-1_Final_Draft.pdf
- Alberta_Reliabilty_Standards_Glossary_of_Terms_Dec_17_2008.pdf
-
Final Alberta Reliability Standards (“Reliability Standards”)
[Posted: December 11, 2008] -
Final Recommendation to Not Adopt NERC Reliability Standards (“NERC Standards”)
[Posted: December 11, 2008] - Proposed_Definitions_for_BAL-006-AB-1_(blacklined).pdf
- Proposed_Definitions_for_BAL-003-AB-0a_(blacklined).pdf
- Proposed_Definitions_for_BAL-001-AB-0a_(blacklined).pdf
- BAL-006-AB-1_Final_DRAFT.pdf
- BAL-003-AB-0a_Final_DRAFT.pdf
- BAL-001-AB-0a_Final_DRAFT.pdf
November
-
Notice of Filing – Alberta Reliability Standards (“Reliability Standards”)
[Posted: November 20, 2008] - Defined_Terms_FILED_(clean)_Nov_20_2008.pdf
- Defined_Terms_FILED_(blacklined)_Nov_20_2008.pdf
- INT-003-AB-2_FILED_(clean)_Nov_20_2008.pdf
- INT-003-AB-2_FILED_(blacklined)_Nov_20_2008.pdf
- TOP-005-AB-1_FILED_(clean)_Nov_20_2008.pdf
- TOP-005-AB-1_FILED_(blacklined)_Nov_20_2008.pdf
- FAC-003-AB-1_FILED_(clean)_Nov_20_2008.pdf
- FAC-003-AB-1_FILED_(blacklined)_Nov_20_2008.pdf
-
Final Alberta Reliability Standards (“Reliability Standards”): a) FAC-003-AB-1 Transmission Vegetation Management Program b) TOP-005-AB-1 Operational Reliability Information c) INT-003-AB-2 Interchange Transaction Implementation
[Posted: November 6, 2008] -
Process for Adoption of Alberta Reliability Standards
[Posted: November 6, 2008] -
Stakeholder Comment and Response Nov 6 2008
[Posted: November 6, 2008] - TOP-005-AB-1_FINAL_DRAFT_(clean)_Nov_6_2008.pdf
- TOP-005-AB-1_FINAL_DRAFT_(blacklined)_Nov_6_2008.pdf
- INT-003-AB-2_FINAL_DRAFT_(clean)_Nov_6_2008.pdf
- INT-003-AB-2_FINAL_DRAFT_(blacklined)_Nov_6_2008.pdf
- FAC-003-AB-1_FINAL_DRAFT_(clean)_Nov_6_2008.pdf
- FAC-003-AB-1_FINAL_DRAFT_(blacklined)_Nov_6_2008.pdf
- Defined_Terms_FINAL_(clean)_Nov_6_2008.pdf
- Defined_Terms_FINAL_(blacklined)_Nov_6_2008.pdf
-
Proposed Alberta Reliability Standards (“Reliability Standards”)
[Posted: November 6, 2008] - Stakeholder_Comment_Matrix_DEC_2008_LI_ARS.doc
- Proposed_Definitions_for_BAL-006-AB-1.pdf
- Proposed_Definitions_for_BAL-003-AB-0a.pdf
- Proposed_Definitions_for_BAL-001-AB-0a.pdf
- Comparison_between_BAL-006-1_and_BAL-006-AB-1_Draft_2.pdf
- Comparison_between_BAL-003-1_and_BAL-003-AB-1_Draft_2.pdf
- Comparison_between_BAL-001-1_and_BAL-001-AB-1_Draft_2.pdf
- BAL-006-AB-1_DRAFT2_(clean).pdf
- BAL-003-AB-0a_DRAFT2_(clean).pdf
- BAL-001-AB-0a_DRAFT2_(clean).pdf
-
Proposal to Not Adopt NERC Reliability Standards (“NERC Standards”)
[Posted: November 6, 2008]
September
-
Stakeholder Comments on Letter of Notice – Proposed New Level I ISO Alberta Reliability Standards (“ARS”)
[Posted: September 17, 2008] -
Alberta Reliability Standards Initiative, Stakeholder Session Presentation, September 3, 2008
[Posted: September 4, 2008]
August
-
Alberta Reliability Standards Initiative, Stakeholder Session Sept. 3, 2008
[Posted: August 20, 2008] -
Letter of Notice – Proposed Reliability Standards and Level I ISO Rules (together “Reliability Standards”)
[Posted: August 14, 2008] - Reliability Standards Implementation Plan
- Stakeholder_Comment_Matrix_OCT_2008_LI_RelStds
- New definitions 2008-08-12 _2
- DRAFT 2 TOP-005-AB-1 _2
- DRAFT 2 INT-003-AB-2 _2
- DRAFT 2 FAC-003-AB-1 _2
- Comparison between TOP-005-1 and TOP-005-AB-1
- Comparison between INT-003-2 and INT-003-AB-2
- Comparison between FAC-003-1 and FAC-003-AB-1
-
Reliability Standards Implementation Plan
[Posted: August 14, 2008]