Wild Rose Wind Farm Interconnection
-
Wild Rose 1 and Wild Rose 2 Wind Energy Connections Needs Identification Document - Part 1
[Posted: October 29, 2010] -
Wild Rose 1 and Wild Rose 2 Wind Energy Connections Needs Identification Document - Part 2 A
[Posted: October 29, 2010] -
Wild Rose 1 and Wild Rose 2 Wind Energy Connections Needs Identification Document - Part 2 B
[Posted: October 29, 2010] -
Wild Rose 1 and Wild Rose 2 Wind Energy Connections Needs Identification Document - Part 3
[Posted: October 29, 2010] -
Notification of Regulatory Filing of need to connect wind power facilities to transmission system in southeastern Alberta
[Posted: October 19, 2010] -
"Updated" - Wild Rose One and Two Connection NID - Need for transmission system development in the Medicine Hat area
[Posted: October 8, 2010] -
Potential Transmission Reinforcement in Southeast Alberta Backgrounder
[Posted: April 28, 2010]