Stage 2: Connection Proposal

 

Stage 2 is the stage where the connection studies are completed and the Connection Proposal is finalized. The cost for the connection is included in the Connection Proposal. At the end of this stage, the AESO accepts the Connection Proposal (or Customer accepts if AESO completes). The Customer must meet security requirements for Stage 3 and 4 costs related to the preparation of the NID and/or FA. The Customer is required to provide specific machine data for dynamic studies in order to complete Gate 2.