Filed
In this section you will find links to AESO Needs Identification Documents that have been filed with the Alberta Utilities Commission (AUC) and are awaiting approval.- 240/144 kV and 240/138 kV Transformers Application for Preparatory Operations
- 9L66 Line Relocation Project
- Airdrie-Balzac Area Reactive Requirements
- Balzac 391S Transformer Upgrade
- Dry Creek 186S Capacity Increase
- Fickle Lake 406S Capacity Increase
- Ghost Pine Wind Power Facility
- Hanna Region Transmission Development
- Hardisty 377S Substation Capacity Upgrade
- Kearl Oil Sands Project 240 kV Line Systemization
- North-Central Region Transmission Development (Slave Lake and surrounding areas)
- Northwest Upgrading Connection
- South Calgary 69 kV Transmission Upgrade
- TransCanada Test Cell Interconnection
- Westlock Area Transmission System Development
- Wild Rose Wind Farm Interconnection
- Yellowhead Area Transmission Development