Your browser is no longer supported

To get the best experience with www.aeso.ca, we suggest using a newer version of Internet Explorer/Edge, or using another supported browser such as Google Chrome.

ETS users may continue to log in using Internet Explorer 9 using the upper right hand link marked ETS Login.

    Engineering study report

    The Stage 3 Needs Identification Document Engineering Study Report is a technical document outlining the preferred alternative for transmission applications to the Alberta Utilities Commission. It consists of three components that can be downloaded below.

    For studies of the preferred alternative selection, download our connection study scope.

    For results from the study in the previous component, download our connection assessment results.

    To read our about our preferred alternative selection, read our connection assessment recommendations.