    Al Rothbauer 321S Substation

    The City of Medicine Hat (City) currently connects to Alberta’s transmission system through the Medicine Hat 41S substation. The City has applied to the Alberta Electric System Operator to change its point of interconnection to a new substation it is planning to build north of the Medicine Hat 41S substation.

    Need overview

    Need for the Al Rothbauer 321S substation in the Medicine Hat area [Posted: July 29, 2015]

    Notification of regulatory filing advertisement

    Notification of regulatory filing [Posted: November 17, 2015]

    Needs Identification Document

    Al Rothbauer 321S substation NID [Posted: December 21, 2015]