    Capital Power Energy Centre Connection

    Capital Power Corporation (Capital Power) has requested transmission system access for its proposed Genesee Generating Station, Units 4 and 5. Capital Power’s request can be met by expanding the existing Genesee 330P substation to add four new 500 kV breakers and associated equipment and by constructing two short transmission lines connecting Genesee 330P to Capital Power’s new generating units.

    Need overview

    Need for the Genesee 330P Substation Upgrade in the Edmonton area [Posted: February 26, 2015]

    Notification of regulatory filing advertisement

    Notification of Regulatory Filing [Posted: February 16, 2016]

    Needs Identification Document

    Capital Power Energy Centre Connection NID [Posted: March 16, 2016]