    Clover Bar Substation Modification

    EPCOR Distribution & Transmission Inc. (EPCOR) has applied to the Alberta Electric System Operator (AESO) for transmission system access to reliably serve growing demand for electricity in the City of Edmonton. EPCOR’s request can be met by the following solution:

    • Modify the existing Clover Bar substation, including adding two 25 kilovolt (kV) circuit breakers.
    • Add or modify associated equipment as required for the above transmission developments.

    Need overview

    Need for the Clover Bar substation Modification in the City of Edmonton [Posted: January 4, 2017]

    Notification of regulatory filing advertisement

    Need for the Clover Bar Substation Modification in the City of Edmonton [Posted: March 13, 2017]

    Latest updates

    • Mar. 13, 2017 Clover Bar Substation Modification - Notice of NID Filing
    • Jan. 4, 2017 Need for the Clover Bar substation Modification in the City of Edmonton