    Cold Lake Area Energy Centre Project Connection (2034)

    Strathcona Resources Ltd. (Strathcona Resources) has applied to the AESO for transmission system access to connect its proposed Cold Lake Area Energy Centre Project (Facility) in the Bonnyville area. Strathcona Resources’ request can be met by the following solution:

    • Add one 144 kilovolt (kV) transmission line to connect the Facility to the existing 144 kV transmission line 7LA53 in a T-tap configuration.
    • Add or modify associated equipment as required for the above transmission developments.

    Need Overview

    Latest updates

    • Aug. 24, 2023 Need Overview Update: Cold Lake Area Energy Centre Project Connection