Cypress Wind Power Project Connection (2122)
Cypress Renewable Energy Centre LP. (Cypress) has applied to the AESO for transmission system access to connect its proposed Cypress Wind Power Project (Facility) in the Dunmore Area. Cypress' request can be met by the following solution:
- Add one 240 kilovolt (kV) transmission line to connect the Facility to the existing 240 kV transmission line 983L in a T-tap configuration.
- Add or modify associated equipment as required for the above transmission developments.
Notice of Filing
Notice of Filing for the Cypress Wind Power Project Connection [March 2, 2020]
Need Overview
Need for the Cypress Wind Power Project Connection in the Dunmore Area [Posted: Dec. 3, 2019]
Needs Identification Document
Cypress Wind Power Project Connection Needs Identification Document [Posted: March 18, 2020]
Appendix A - Connection Assessment
Appendix B - Capital Cost Estimate
Appendix C - AESO Participant Involvement Program
Appendix D - Information Regarding AUC Rule 007, Section 6.2.2, NID25(2) and NID23(3)
Latest updates
- AESO NID Filed: Cypress Wind Power Project Connection
- Notice of Filing: Cypress Wind Power Project Connection
- Need Overview: Cypress Wind Power Project Connection