    Deerland Peaking Station Energy Connection (1289)

    The Maxim Power Corp. request for system access service to connect its Deerland Peaking Power Station in the Fort Saskatchewan area was cancelled on September 13, 2021.

    Cancellation of Needs Identification Document

    Notice

    Need Overview

    Notice of Filing

    Needs Identification Document

     

    Appendix A - Connection Assessment
    Appendix B - TFO Capital Cost Estimate
    Appendix C - AESO Participant Involvement Program
    Appendix D - Information Regarding Rule 007, Section 6.1 - NID (13)
    Appendix E - AESO Transmission Planning Criteria - Basis and Assumptions

    Latest updates

    • Jan. 13, 2022 Cancellation Notice: Deerland Peaking Station Energy Connection