    Drywood Expansion Power Plant Connection

    BowArk Energy Ltd.  (BowArk) has applied to the Alberta Electric System Operator (AESO) for transmission system access to connect its proposed Drywood Expansion Power Plant (Facility) in the hamlet of Twin Butte area. BowArk's request can be met by the following solution:

    • Add a 138 kilovolt (kV) transmission line to connect the Facility to the existing 138 kV transmission line 164L.
    • Add or modify associated equipment as required for the above transmission development.

    Need overview

    Need for the Drywood Expansion Power Plant Connection in the hamlet of Twin Butte area  [Posted: February 14, 2019]

    Market Participant Notification

    Market Participant Notification for the Drywood Expansion Power Plant Connection [Posted: April 30, 2019]

    Latest updates

    • Feb. 14, 2019 Drywood Expansion Power Plant Connection