    Edwards Lake 189S Substation

    FortisAlberta Inc. (FortisAlberta) has requested a transmission connection to serve a new industrial load in the Conklin area. FortisAlberta’s request can be addressed through the development of a new substation, to be called Edwards Lake 189S, and two new 240 kV transmission circuits to connect the proposed substation to the existing transmission system.

    Need overview

    Need for the Edwards Lake 189S Substation in the Conklin Area

    Notification of regulatory filing advertisement

    Notification of AESO Regulatory Filing Addressing the Need for the New Edwards Lake 189S Substation in the Christina Lake Area

    Needs Identification Document

    Edwards Lake 189S Substation NID

    Application for cancellation of NID approval

    Application for Cancellation of NID Approval