    Fort Macleod 15S Substation Upgrade

    FortisAlberta Inc. (FortisAlberta) has applied to the Alberta Electric System Operator (AESO) for transmission system access to improve the reliability of the electricity services in the Fort Macleod area. FortisAlberta’s request can be met by the following solution:

    • Upgrade the existing Fort Macleod 15S substation, including adding a 138/25 kilovolt (kV) transformer and a 138 kV circuit breaker.
    • Add or modify associated equipment as required for the above transmission developments. 

    Need Overview

    Need for Transmission Development in the Town of Fort Macleod [Posted: July 20, 2017]

    Notification of regulatory filing advertisement

    Notice of NID Filing for the Fort Macleod 15S Substation Upgrade [Posted: October 5, 2017]

    Need Identification Document

    Fort Macleod 15S Substation Upgrade NID [Posted: October 23, 2017]

    Latest updates

    • Oct. 5, 2017 Notice of NID Filing for the Fort Macleod 15S Substation Upgrade
    • Jul. 20, 2017 Need for Transmission Development in the Town of Fort MacLeod