    Grizzly Bear Creek Wind Power Plant Connection

    E.ON Climate & Renewables Canada Ltd. (E.ON) has applied to the Alberta Electric System Operator for transmission system access to connect its proposed Grizzly Bear Creek Wind Power Plant (Facility) in the Vermilion area. E.ON’s request can be met by:

    Vermilion Area

    • Build the Steele 2016S substation with a 144 kV circuit breaker, and associated equipment;
    • Build approximately 20 kilometres of 144 kV transmission line to connect the Facility to the Steele 2016S substation; and
    • Modify the existing 7L65 transmission line.

    Vegreville Area

    • Modify the Vincent 2019S substation including adding a 144 kV transmission line, two 144 kV circuit breakers, and associated equipment; and
    • Modify the existing 7L65 transmission line.

    Need overview

    Need for Developments in the Vermilion and Vegreville Areas to Connect the Grizzly Bear Creek Wind Power Plant [Posted: December 7, 2015]

    Notification of regulatory filing advertisement

    Notification of Regulatory Filing [Posted: May 9, 2016]

    Needs Identification Document

    Grizzly Bear Creek Wind Power Plant Connection NID [Posted: May 30, 2016]