    Heartland Generating Station Interconnection

    ATCO Power (ATCO) has requested transmission system access for its proposed Heartland Generating Station Facility (Facility) near the city of Fort Saskatchewan. ATCO’s request can be met by the following solution:

    • Add one 240 kV transmission line to connect ATCO’s approved Lamont 400S substation to the existing Josephburg 410S substation in a radial configuration
    • Modify the existing Josephburg 410S substation, including adding one 240 kV circuit breaker
    • Add or modify associated equipment as required for the above transmission development

    Key documents

    Stakeholder Update - Need for the Heartland Generating Station Interconnection near the City of Fort Saskatchewan [Posted: October 12, 2016]

    Stakeholder Update - Need for the Heartland Generating Station Interconnection near the City of Fort Saskatchewan [Posted: March 30, 2016]

    Need for the Heartland Generating Station Interconnection near the City of Fort Saskatchewan [Posted: September 19, 2014]

    Notification of regulatory filing advertisement

    Need for the Heartland Generating Station Connection in the Fort Saskatchewan Area [Posted: April 4, 2017]

    Needs Identification Document

    Heartland Generating Station Connection NID [Posted:April 25, 2017]

    Appendix A - Connection Assessment
    Appendix B - TFO Capital Cost Estimates
    Appendix C - AESO PIP
    Appendix D - Info Re Rule 007 Sec 6.2.2 - NID 23(3)
    Appendix E - AESO Transmission Planning Criteria - Basis and Assumptions

    Contact us

    We appreciate your views, both on the need for transmission system development and proposed transmission plans. If you have any questions or comments, please contact us directly.

    AESO Stakeholder Relations
    stakeholder.relations@aeso.ca
    1-888-866-2959

    Latest updates

    • Apr. 4, 2017 Heartland Generating Station Interconnection - Notice of NID Filing
    • Oct. 12, 2016 Stakeholder update: Heartland Generating Station Interconnection near the City of Fort Saskatchewan