    Hornbeck 345S Substation

    FortisAlberta Inc. (FortisAlberta) has applied to the Alberta Electric System Operator (AESO) for transmission system access to reliably serve industrial load growth in the Town of Edson area. FortisAlberta’s request can be met by the following solution:

    • Build the Hornbeck substation with one 138/4.16 kV transformer, two 138 kV circuit breakers, and associated equipment; and
    • Build two 138 kV transmission lines to connect the Hornbeck substation to the transmission system.

    Need overview

    Need for the Hornbeck 345S Substation in the Town of Edson area [Posted: February 24, 2016]

    Notification of regulatory filing advertisement

    Notification of Regulatory Filing [Posted: September 6, 2016]

    Needs Identification Document

    Hornbeck 345S Substation Needs Identification Document [Posted: September 26, 2016]