    Irma Energy Connection

    Irma Wind Farm Ltd. (Irma Wind) has applied to the Alberta Electric System Operator for transmission system access to connect its proposed wind generating facility (Facility) in the Irma area. Irma Wind’s request can be met by the following solution:

    • Modify the existing Buffalo Creek 526S substation, including adding a 138 kilovolt (kV) circuit breaker and associated equipment
    • Add approximately 15 kilometres of 138 kV transmission line to connect the Facility to the Buffalo Creek 526S substation

    Need Overview

    Need for the Irma Energy Connection in the Irma area [Posted: September 6, 2016]

    Market Participant Notification

    Market Participant Notification for the Irma Wind Power Project Connection [Posted: June 28, 2017]

    Notification of regulatory filing advertisement

    Irma Wind Power Project Connection – Notice of NID Filing [Posted: July 13, 2017]

    Latest updates

    • Jul. 13, 2017 Need for the Irma Wind Power Project Connection in the Irma Area
    • Jun. 28, 2017 Market Participant Notification for the Irma Wind Power Project Connection