    Kirby North Central Processing Facility Connection

    Canadian Natural Resources Limited (Canadian Natural) has applied to the AESO for transmission system access to connect its proposed oil sands recovery facility, called the Kirby North Central Processing Facility (the Facility) in the Conklin area. The Facility will be served by Canadian Natural's proposed Margie 1034S substation. Canadian Natural's request can be met by the following solution:

    • Add one new 138 kV circuit to connect the Facility to the existing 138 kV transmission line 789L.
    • Add or modify associated equipment as required for the above transmission developments.

    Need overview

    Need for the Kirby North Central Processing Facility Connection in the Conklin Area [Posted: February 27, 2018]

    Notification of regulatory filing advertisement

    Notice of Filing for the Kirby North Central Processing Facility Connection [Posted: May 31, 2018]

    Needs Identification Document

    Kirby North Central Processing Facility Connection Needs Identification Document [Posted: June 15, 2018]

    Appendix A - Connection Assessment
    Appendix B - TFO Capital Cost Estimates
    Appendix C - AESO Participant Involvement Program
    Appendix D - Information regarding Rule 007, Section 6.2.1 NID15(2)

    Latest updates

    • Jun. 15, 2018 AESO NID Filed: Kirby North Central Processing Facility Connection
    • May. 31, 2018 Notice of Filing for the Kirby North Central Processing Facility Connection
    • Feb. 27, 2018 Need for the Kirby North Central Processing Facility Connection