    Pinedale 207S Substation Upgrade

    FortisAlberta Inc. (FortisAlberta) has applied to the Alberta Electric System Operator (AESO) for transmission system access to reliably serve growing demand for electricity in the Town of Edson area. FortisAlberta’s request can be met by the following solution:

    • Upgrade the existing Pinedale 207S substation, including adding a 138/25 kilovolt (kV) transformer and a 138 kV circuit breaker.
    • Add or modify associated equipment as required for the above transmission developments.

    Need Overview

    Pinedale 207S Substation Upgrade – Need for Transmission Development in the Town of Edson area [Posted: July 11, 2017]

    Latest updates

    • Jul. 11, 2017 Pinedale 207S Substation Upgrade