Sollair Solar Energy Project Connection (2405)
General Land & Power Corp (General Land & Power) has applied to the AESO for transmission system access to connect its proposed Sollair Solar Energy Project (Facility) in the Airdrie area. General Land & Power’s request can be met by the following solution:
- Add one 138 kilovolt (kV) transmission line to connect the Facility to the existing 138 kV transmission line 688L in a T-tap configuration.
- Add or modify associated equipment as required for the above transmission developments.
Need Overview
- Need for the Sollair Solar Energy Project Connection in the Airdrie area [Posted: Feb. 24, 2022]
Latest updates
- Need Overview: Sollair Solar Energy Project Connection