    Suncor Forty Mile Wind Power Project Energy Connection

    Suncor Energy Inc. (Suncor) has applied to the Alberta Electric System Operator (AESO) for transmission system access to connect its proposed Suncor Forty Mile Wind Power Project (Facility) in the Maleb area. 

    Suncor’s request can be met by the following solution:

    • Modify the existing Whitla 251S substation, including adding a 240 kilovolt (kV) circuit breaker.
    • Add a 240 kV transmission line to connect the Facility and the existing Whitla 251S substation.
    • Add or modify associated equipment as required for the above transmission developments. 

    Need Overview

    Need for the Suncor Forty Mile Wind Power Project Energy Connection in the Maleb area [Posted: April 11, 2017]

    Latest updates

    • Apr. 11, 2017 Need for the Suncor Forty Mile Wind Power Project Energy Connection in the Maleb area