    Suncor Forty Mile Wind Power Project Whitla Connection

    Forty Mile Granlea Wind GP Inc. (Forty Mile GP) a wholly owned subsidiary of Suncor Energy Inc. has submitted two applications to the Alberta Electric System Operator (AESO) for transmission system access to connect its proposed Suncor Forty Mile Wind Power Project (Facility) in the Maleb area. One of these requests can be met by a connection to the existing 240 kV transmission line 964L, as further described in the AESO Need Overview Update (October 2018),"Need for the Suncor Forty Mile Wind Power Project 964L Connection in the Maleb area". Forty Mile GP’s other request can be met by the following solution:

    • Modify the existing Whitla 251S substation, including adding one 240 kilovolt (kV) circuit breaker.
    • Add one 240 kV transmission line to connect the Facility to the Whitla 251S substation.
    • Add or modify associated equipment as required for the above transmission development.

     

    Need Overview

    Update II - Need for the Suncor Forty Mile Wind Power Project Whitla Connection in the Maleb area [Posted: October 30, 2018]

    Update - Need for the Suncor Forty Mile Wind and Solar Power Projects Connection in the Maleb area [Posted: November 28, 2017]

    Need for the Suncor Forty Mile Wind Power Project Energy Connection in the Maleb area [Posted: April 11, 2017]

     

    Market Participant Notification

    Market Participant Notification for the Suncor Forty Mile Wind Power Project Connection [Posted: October 25, 2018]

    Latest updates

    • Oct. 30, 2018 Update II - Need for the Suncor Forty Mile Wind Power Project Whitla Connection in the Maleb area
    • Oct. 25, 2018 Market Participant Notification for the Suncor Forty Mile Wind Power Energy Connection
    • Nov. 28, 2017 Update - Need for the Suncor Forty Mile Wind and Solar Power Projects Connection in the Maleb area
    • Apr. 11, 2017 Need for the Suncor Forty Mile Wind Power Project Energy Connection in the Maleb area