    Thornton 2091S Substation

    ATCO Electric Ltd. (ATCO) has applied to the Alberta Electric System Operator for transmission system access to supply new demand for electricity in the Grande Prairie area. ATCO’s request can be met by adding a new substation, to be called Thornton 2091S, which includes a 144 kV transformer, two 144 kV breakers, and associated equipment, and by adding two new 144 kV transmission lines, each approximately 2km, to connect the new substation to the existing 144 kV transmission line 7L20.

    Need overview

    Need for the Thornton 2091S Substation in the Grande Prairie area [Posted: July 30, 2015]

    Notification of regulatory filing advertisement

    Notification of Regulatory Filing [Posted: September 14, 2015]

    Needs Identification Document

    Thornton 2091S Substation Needs Identification Document [Posted: October 19, 2015]