    View all projects

    Travers Solar Project Connection

    Greengate Power Corporation (Greengate) has applied to the Alberta Electric System Operator (AESO) for transmission system access to connect its proposed Travers Solar Project (Facility) in the Lomond area. Greengate's request can be met by the following solution:

    • Add one 240 kilovolt (kV) transmission line to connect the Facility to the existing 240 kV transmission line 1005L.
    • Add or modify associated equipment as required for the above transmission developments.

    Need Overview

    Need for the Travers Solar Project Connection in the Lomond Area [Posted: March 18, 2019]

    Market Participant Notification

    Market Participant Notification for the Travers Solar Project Connection [Posted: July 26, 2019]

    Notice of Filing

    Notice of Filing for the Travers Solar Project Connection [August 13, 2019]

    Latest updates

    • Aug. 13, 2019 Notice of Filing: Travers Solar Project Connection
    • Mar. 18, 2019 Travers Solar Farm Connection – Need for Transmission Development in the Lomond area