    Victoria Substation Modification

    EPCOR Distribution & Transmission Inc. (EPCOR) has applied to the Alberta Electric System Operator  for transmission system access to reliably serve new demand for electricity in the city Of Edmonton. EPCOR’s request can be met by the following solution:

    • Modify the Victoria substation, including adding two 15 kilovolt circuit breakers and associated equipment.

    Need Overview

     Need for the Victoria Station Modification in the City of Edmonton [Posted: September 14, 2016]

    Approval of System Access Service Request

    The AESO may approve this request for transmission system access under our abbreviated needs approval process (ANAP). The process is outlined in section 501.3 of the ISO rules, Abbreviated Needs Approval Process.

    AESO Approval Letter - Victoria Substation Modification (December 1, 2016)

    Supporting Documents:

     

    Contact us

    We appreciate your views, both on the need for transmission system development and proposed transmission plans. If you have any questions or comments, please contact us directly.

    AESO Stakeholder Relations
    stakeholder.relations@aeso.ca
    1-888-866-2959

    Latest updates

    • Sep. 15, 2016 Victoria Substation Modification – Need for Transmission System Development in the City of Edmonton