Your browser is no longer supported

To get the best experience with www.aeso.ca, we suggest using a newer version of Internet Explorer/Edge, or using another supported browser such as Google Chrome.

ETS users may continue to log in using Internet Explorer 9 using the upper right hand link marked ETS Login.

    View all projects

    Wheatland Wind Project Connection

    Wheatland Wind Project LP, by its general partner Wheatland Wind Project Ltd. (Wheatland), has applied to the Alberta Electric System Operator (AESO) for transmission system access to connect its proposed Wheatland Wind Project (Facility) in the Dorothy area. Wheatland’s request can be met by the following solution:

    • Add a substation (Parker 2072S) with three 144 kilovolt (kV) circuit breakers.
    • Add two 144 kV transmission lines to connect the proposed Parker 2072S substation to the existing 144 kV transmission line 7L85.
    • Add a 144 kV transmission line to connect the Facility to the proposed Parker 2072S substation.
    • Add or modify associated equipment as required for the above transmission developments. 

    Need overview

    Need for the Wheatland Wind Project Connection in the Dorothy area [Posted: September 27, 2017]

    Latest updates

    • Sep. 27, 2017 Need for the Wheatland Wind Project Connection in the Dorothy area