Wild Rose 1 Wind Power Project Connection (479)
The Wild Rose 1 Wind LP request for system access service to connect the Wild Rose 1 Wind Power Project in the Dunmore area was cancelled on July 12, 2022.
Notice
- Cancellation Notice for the Wild Rose 1 Wind Power Project Connection [Posted: Aug. 4, 2022]
Needs Identification Document
- Wild Rose 1 and 2 Wind Power Project Connection Amended Need Identification Document [Posted: May 29, 2015]
- Wild Rose 1 and 2 Wind Power Project Connection Need Identification Document [Posted: Oct. 29, 2010]
Latest updates
- Cancellation Notice: Wild Rose 1 Wind Power Project Connection