    Wild Rose 2 Wind Power Project Connection (693)

    Wild Rose 2 Wind LP (Wild Rose) has applied to the AESO for transmission system access to connect its approved Wild Rose 2 Wind Power Project in the Dunmore area. Wild Rose's request can be met by the following revised solution:

    • Add the Elkwater 243S substation, including three 240 kilovolt (kV) circuit breakers.
    • Connect the Elkwater 264S substation to the existing 240 kV transmission line 983L in an in-and-out configuration.
    • Add or modify associated equipment as required for the above transmission developments.

    Need Overview

    Needs Identification Document

    Latest updates

    • Aug. 4, 2022 Updated Need Overview: Wild Rose 2 Wind Power Project Connection