    Windy Hill Biomass Generation Plant Connection

    Mustus Energy Limited (Mustus) has applied to the Alberta Electric System Operator for connection of its Windy Hill Biomass Generation Plant to be located in the High Level area. Mustus’ connection request can be met by modifying the Blumenort 832S substation and adding a 144 kV transmission line between the Blumenort 832S and Mustus’s Windy Hill 675S substation.

    Need overview

    Need for the Windy Hill Biomass Generation Plant Connection in the High Level Area [Posted: August 7, 2013]

    Needs Identification Document

    Mustus Biomass Needs Identification Document - Filed March 26, 2014

    Contact us

    We appreciate your views, both on the need for transmission system development and proposed transmission plans. If you have any questions or comments, please contact us directly.

    AESO Stakeholder Relations
    stakeholder.relations@aeso.ca