NPC1 Denis St. Pierre change in maximum capability (MC) notice
Northstone Power Corp. has advised the AESO that, effective January 14, 2022, the MC of existing asset NPC1 will decrease from 11 MW to 3 MW. As a result, the asset will no longer be dispatchable and will be removed from the Current Supply Demand Report effective January 14, 2022.