Genesee Repower 1 (GNR1) and Genesee Repower 2 (GNR2) Generator Testing
Genesee Repower 1 (GNR1), and Genesee Repower 2 (GNR2) will be performing MSSC testing. GNR1 testing will perform on March 13, 2026. GNR2 testing will perform on April 9, 2026. During the testing, unit will be operating above the Maximum Capability (MC) up to 520 MW.