Technical requirements
Generation and Load requirements
The Generation and Load Interconnection standard is replaced by ISO Rules Sections:
- Section 502.1 - Aggregated Generating Facilities Technical Requirements
- Section 502.5 - Generating Unit Technical Requirements
- Section 502.6 - Generating Unit Operating Requirements
- Section 502.7 - Load Facility Technical Requirements
- Section 502.13 - Battery Energy Storage Facility Technical Requirements
- Section 502.14 - Battery Energy Storage Facility Operating Requirements
- Section 502.16 - Aggregated Generating Facilities Operating Requirements
Reactive power letter
- Stakeholder letter - ISO tariff – Generating Unit Compliance with Reactive Power Requirements [Posted: May 11, 2007]
- AESO PPA Reactive Power Guidelines [Posted: May 11, 2007]
- Stakeholder letter - Follow-up to letter of reactive power from generating units [Posted: November 2, 2006]
- Stakeholder letter - Reactive power from generating units [Posted: October 27, 2006]
Previous technical requirements
- Generation and Load Interconnection Standard [Posted: October 27, 2006]
- Model Validation Report Requirements [Posted: December 6, 2005]
- Technical requirements for connecting generators (1999)
- Technical requirements for connecting loads (1999)
Revenue metering
The AESO is the measurement system and data centre provider for the Alberta Interconnected Electricity System (AIES).
- Metering system test report [Posted: January 9, 2008]
- Annual metering systems testing compliance plan [Posted: January 9, 2008]
- Measurement system standard [Posted: September 18, 2007]