    Cascade Power Plant Project Connection

    Cascade Power Project Limited Partnership(Cascade Power) has applied to the AESO for transmission system access to connect its approved Cascade Power Plant Project (Facility) in the Edson area. Cascade Power’s request can be met by the following solution:

    • Add three 240 kilovolt (kV) transmission lines to connect the Facility to the existing Bickerdike 39S substation.
    • Modify the existing Bickerdike 39S substation, including adding four 240 kV circuit breakers.
    • Add or modify associated equipment as required for the above transmission developments.

    Need Overview

    Need for the Cascade Power Plant Project Connection in the Edson area [Posted: Dec. 5, 2019]

    Latest updates

    • Dec. 5, 2019 Need Overview: Cascade Power Plant Project Connection