    Vauxhall Solar Farm Connection

    Solar Krafte Utilities Inc. (Solar Krafte) has applied to the Alberta Electric System Operator (AESO) for transmission system access to connect its proposed Vauxhall Solar Farm (Facility) in the Vauxhall Area. Solar Krafte's request can be met by the following solution:

    • Add one 138 kilovolt (kV) transmission line to connect the Facility to the existing Vauxhall 158S substation.
    • Modify the Vauxhall 158S substation, including adding one 138 kV circuit breaker.
    • Add or modify associated equipment as required for the above transmission developments.

    Need Overview

    Need for the Vauxhall Solar Farm Connection in the Vauxhall Area [Posted: May 7, 2020]

    Latest updates

    • May. 7, 2020 Need Overview: Vauxhall Solar Farm Connection