Project Data Update Package Submissions
The Project Data Update Package - Instruction Manual (PDUP-IM) and Supplementary Data Forms are provided as tools to improve the consistency of project data submissions to the Alberta Electric System Operator (AESO). Consistency of data submissions allows the AESO to improve the accuracy and the availability of project models posted to the AESO website for use in project studies.
Project Data Update Package – Instruction Manual
-
Project Data Update Package - Instruction Manual
[Posted: July 28, 2011]
Supplementary Data Forms
-
Pre-Project SLD
[Posted: March 29, 2012] -
Project or Facility SLD
[Posted: March 29, 2012] -
Project IDEV
[Posted: March 29, 2012] -
7.4.1 Load Forecast
[Posted: March 29, 2012] -
7.4.2 Static Loads and Generation
[Posted: March 29, 2012] -
7.4.3 Load Element Mapping
[Posted: March 29, 2012] -
7.4.4 Facility and Elements
[Posted: March 29, 2012] -
7.4.5 Line Segments
[Posted: March 29, 2012] -
7.4.6 Branches
[Posted: March 29, 2012] -
7.4.7 Line Mutuals
[Posted: March 29, 2012] -
7.4.8 Transformer Windings
[Posted: March 29, 2012] -
7.4.9 Transformer Impedances
[Posted: March 29, 2012] -
7.4.10 Machines
[Posted: March 29, 2012] -
7.4.11 Control Systems
[Posted: March 29, 2012] -
7.4.12 PS Models
[Posted: March 29, 2012] -
7.4.13 Shunts
[Posted: March 29, 2012] -
Busses
[Posted: March 29, 2012] -
Facility Code Request
[Posted: March 29, 2012]