Behind the Fence Projects
Behind the Fence (BTF) projects include those projects requiring work to an existing site currently connected to the AIES. There is no physical change or upgrade to the transmission system required as a result of this project.
If a physical change to the Transmission connection is required then a project must follow the Connection Process.
-
Behind the Fence and Contract Changes Stakeholder Session - September 18, 2012
[Posted: September 4, 2012] - Behind the Fence and Contract Changes Presentation - September 18, 2012
Process Map
Application Template
Description and Guidelines
-
Behind the Fence Guidelines
[Posted: July 30, 2012]
Transmission Modelling Data
In this section:
This section outlines the process and requirements for a Standard Behind the Fence Project as described in the Behind the Fence Guidelines.