| Standard |
Approved |
Effective |
| Resource and Demand Balancing (BAL) |
|
|
| BAL-001-AB-0a Real Power Balancing Control Performance |
2009-02-04 |
2009-02-13 |
| BAL-002-AB-1 Disturbance Control Performance |
2011-12-20 |
2012-10-01 |
| BAL-STD-002-AB-0 Contingency Reserves |
2011-12-21 |
2012-10-01 |
| BAL-003-AB-0a Frequency Response and Bias |
2009-02-04 |
2009-02-13 |
| BAL-004-AB-1 Time Error Correction |
2011-12-22 |
2012-10-01 |
| BAL-004-WECC-AB-1 Automatic Time Error Correction |
2011-12-22 |
2012-10-01 |
| BAL-006-AB-1 Inadvertent Interchange |
2009-02-04 |
2009-02-13 |
| Critical Infrastructure Protection (CIP) |
|
|
| CIP-001-AB-1 Sabotage Reporting |
2010-01-12 |
2010-04-12 |
| Emergency Preparedness and Operations (EOP) |
|
|
| EOP-002-AB-2 Capacity and Energy Emergencies |
2009-09-23 |
2009-10-03 |
| EOP-003-AB-1 Load Shedding Plans |
2009-06-17 |
2009-06-17 |
| EOP-004-AB-1 Disturbance Reporting |
2009-06-17 |
2009-06-17 |
| Facilities Design, Connections, and Maintenance (FAC) |
|
|
| FAC-001-AB-0 Facility Connection Requirements |
2009-09-23 |
2010-09-24 |
| FAC-002-AB-0 Coordination of Plans for New Facilities |
2009-09-23 |
2010-03-22 |
| FAC-003-AB-1 Transmission Vegetation Management Program |
2009-01-26 |
2009-03-27 R1-R2: 2010-01-26 |
| FAC-010-AB-2.1 System Operation Limits Methodology for the Planning Horizon |
2011-11-10 |
2012-07-01 |
| FAC-014-AB-2 Establish and Communicate System Operating Limits |
2011-11-10 |
2012-10-01 |
| FAC-501-WECC-AB-1 Transmission Maintenance |
2009-09-09 |
2010-09-10 |
| Interchange Scheduling and Coordination (INT) |
|
|
| INT-001-AB-3 Interchange Information |
2009-09-23 |
2009-10-03 |
| INT-003-AB-2 Interchange Transaction Implementation |
2009-01-26 |
2009-01-26 |
| INT-006-AB-2 Response to Interchange Authority |
2009-09-23 |
2009-10-03 |
| INT-009-AB-1 Implementation of Interchange |
2009-09-23 |
2009-10-03 |
| INT-010-AB-1 Interchange Coordination Exemptions |
2009-09-23 |
2009-10-03 |
| Interconnection Reliability Operations and Coordination (IRO) |
|
|
| IRO-001-AB-1.1 Reliability Coordination Responsibilities and Authorities |
2012-01-24 |
2012-10-01 |
| IRO-006-WECC-AB-1 Qualified Transfer Path Unscheduled Flow Relief |
2010-01-12 |
2010-01-22 |
| Modeling, Data, and Analysis (MOD) |
|
|
| MOD-016-AB-1.1 Documentation of Data Reporting Requirements for Actual and Forecast Demands, and Net Energy for Load |
2010-01-12 |
2010-01-22 |
| MOD–017–AB– 0.1 Aggregated Actual and Forecast Demands and Net Energy for Load |
2010-01-12 |
2010-01-22 |
| MOD–018–AB–0 Reports of Actual and Forecast Demand Data |
2010-01-12 |
2010-01-22 |
| MOD–019–AB–0 Forecasts of Interruptible Demands Data |
2010-01-12 |
2010-01-22 |
| Protection and Control (PRC) |
|
|
| PRC–001–AB–1 Protection System Coordination |
2010-01-12 |
2010-01-22 R1: 2011-01-13 |
| PRC–004–AB–1 Analysis and Mitigation of Transmission and Generation Protection System Misoperation |
2010-01-12 |
2010-02-11 |
| PRC–004–WECC–AB–1 Protection System and Remedial Action Scheme Misoperation |
2010-01-12 |
2010-02-11 |
| PRC-009-AB-0 UFLS Performance Following Underfrequency Event |
2009-09-23 |
2009-10-03 |
| PRC-010-AB-0 Assessment of the Design and Effectiveness of UVLS Program |
2009-09-23 |
2009-10-03 |
| PRC-021-AB-1 Under Voltage Load Shedding Program Data |
2009-09-09 |
2009-09-19 |
| PRC-022-AB-1 Under Voltage Load Shedding Program Performance |
2009-09-23 |
2009-10-03 |
| Transmission Operations (TOP) |
|
|
| TOP-005-AB-1 Operational Reliability Information |
2009-01-26 |
2009-05-26 |
| TOP–007–WECC–AB–1 System Operating Limit |
2010-01-12 |
2010-01-22 |
| Transmission Planning (TPL) |
|
|
| TPL-001-AB-0 System Performance Under Normal Conditions |
2009-09-23 |
2010-09-24 |
| TPL-002-AB-0 System Performance Following Loss of a Single BES Element |
2009-09-23 |
2010-09-24 |
| TPL-003-AB-0 System Performance Following Loss of Two or More BES Elements |
2009-09-23 |
2010-09-24 |
| TPL-004-AB-0 System Performance Following Extreme BES Events |
2009-09-23 |
2010-09-24 |