The AESO believes there is an opportunity to modernize Section 503.22 to reduce the overall cost of bulk transmission line projects and improve the clarity of requirements while still ensuring reliable operation of the Alberta Interconnected Electric System.
The AESO is requesting feedback on the development of proposed amendments to Section 503.22 and Section 503.1 by March 27, 2025. For more information and to provide feedback, visit the Section 503.22, Bulk Transmission Line Technical Requirements page on AESO Engage.
- Date & time March 27, 2025 @ 12:00 AM, MDT to February 27, 2025 @ 12:00 AM, MST