Current applications
-
AESO Bulk and Regional Rate Design and Modernized DOS Rate Design
AESO Bulk and Regional Rate Design and Modernized DOS Rate Design Application [Revised: Mar. 15, 2022]
- Appendix A - Proposed Process Schedule
- Appendix B - Stakeholder Consultation Materials
- Appendix C - Targeted Mitigation Consultation Materials
- Appendix D - NERA Report - AESO Bulk and Regional Tariff Design: Expert Report [Updated: Mar 15, 2022]
- Addendum (Nov. 17, 2021) Appendix D - NERA Expert Report [Updated: Nov. 19, 2021]
- Attachment 1A - 2021-04-11 NRF LT NERA re Expert Report
- Attachment 1B - 19-05-2021 NRF LT NERA re AESO BR Instructions
- Attachment 2 - CVs
- Attachment 3B - Calculation of Classification and Allocation of Costs
- Attachment 4 - Instructions for Reader
- Attachment 4A - AESO Customer Impact Report (2021.05.25)
- Attachment 4B - Customer Response Supporting Analysis
- Attachment 4C - Customer Response Supporting Analysis_Feedback1
- Attachment 4D - Customer Response Supporting Analysis_Feedback2
- Attachment 4J - STATA DO File
- Attachment 5A - Figure 1, 9, 11, and 14
- Attachment 5B - Figure 2 (Electricity Generation)
- Attachment 5C - Figure 3 (AESO Planning Areas)
- Attachment 5D - Figure 5 (Demand, Investment, and Tariffs, 2006-2019)
- Attachment 5E.A - Figure 7a (High Flows on Bulk Lines 17-18) [Updated: Mar 15, 2022]
- Attachment 5E.A.A - 2017 Flows [Updated: Mar 15, 2022]
- Attachment 5E.A.B - 2018 Flows [Updated: Mar 15, 2022]
- Attachment 5E.B - Figure 7b (High Flows on Bulk Lines 19-20) [Updated: Mar 15, 2022]
- Attachment 5E.B.A - 2019 Flows [Updated: Mar 15, 2022]
- Attachment 5E.B.B - 2020 Flows [Updated: Mar 15, 2022]
- Attachment 5F - Figure 8 (Connections by Voltage)
- Attachment 5G - Figure 10, 12 (Classification and Allocation of Costs)
- Attachment 5H - Figure 13 (Regional Load and Generation Shares)
- Attachment 6 – Document List
- Attachment 7A - 2019 Tariff Calculations [Updated: Nov. 19, 2021]
- Attachment 7B - Functionalization Calculation [Updated: Nov. 19, 2021]
- Attachment 7C - O&M Functionalization [Updated: Nov. 19, 2021]
- Updated Appendix E - Bill Impact Workbook – 2019 Test Year [Updated: Nov. 19, 2021]
- Updated Appendix F - 2019 Test Year Proposed Rate Calculations [Updated: Nov. 19, 2021]
- Updated Appendix G - 2019 Test Year Current Rate Calculations [Updated: Nov. 19, 2021]
- Appendix H - Transmission Rate Projection Workbook
- Appendix I - AESO 2015 Revised Long-term Transmission Plan
- Appendix J - AESO 2017 Long-term Outlook
- Appendix K - AESO 2021 Long-term Outlook
- Appendix L - AESO 2020 Long-term Transmission Plan
- Appendix M - AESO Impact of the COVID-19 pandemic and low oil prices on Alberta load
- Appendix N - 2013 London Economics International (LEI) – Alberta Transmission System Cost Causation Study
- Appendix O - Table of Stakeholder-Proposed Amendments to the Proposed Rate Design
- Appendix P - Responses to April 7, 2021 Commission Staff Questions regarding the Preferred Bulk and Regional Tariff design
- Appendix Q - Proposed ISO Tariff
- Appendix R - Draft ISO Tariff Rider M
- Appendix S - Blackline Comparison of Terms & Conditions
- Appendix T - Blackline Comparison of Tariff Rate Sheets
- Appendix U - Blackline Comparison of DOS Rate Sheet
- Appendix V - Proposed DOS Proforma Agreement
- Appendix W - Rate DOS – Current In Effect
- Appendix X - Rate DTS – Current in Effect
- Appendix Y - Rate FTS – Current in Effect
- Appendix Z - Rate PCS – Current in Effect
- Appendix AA - Rate XOM – Current in Effect
- Appendix BB - Rate XOS – Current in Effect