Legal Solar Battery Project Connection (2776)
Legal Solar STL Inc. (Legal Solar) has applied to the AESO for transmission system access to connect its proposed Legal Solar Battery (Facility) in the Legal area. Legal Solar’s request can be met by the following solution:
- Add one 138 kilovolt (kV) transmission line to connect the Facility to the existing 138 kV transmission line 792L using a T-tap configuration.
- Add or modify associated equipment as required for the above transmission developments.
Need Overview
- Need for the Legal Solar Battery Project Connection [Posted: January 14, 2026]
Latest updates
- Need Overview: Legal Solar Battery Project Connection