Red Willow Solar Battery Project Connection (2789)
Red Willow Solar Inc. (RWSI) has applied to the AESO for transmission system access to connect its approved Red Willow Solar Battery (Facility) in the Stettler area. RWSI’s request can be met by the following solution:
- Add one 240 kilovolt (kV) transmission line to connect the Facility to the existing 240 kV transmission line 9L20 using a T-tap configuration.
- Add or modify associated equipment as required for the above transmission developments.
Need Overview
- Need for the Red Willow Solar Battery Project Connection [Posted: January 28, 2026]
Latest updates
- Need Overview: Red Willow Solar Battery Project Connection