Proposal to amend ISO rules related to transmission constraint rebalancing
ATCO EnPower, Capital Power Corporation, Kineticor and Maxim Power Corp. submitted a joint proposal to amend:
- Section 302.1 of the ISO rules, Real-Time Transmission Constraint Management, to remove subsection 7(1)(d) and subsection 8 to align with the elimination of transmission constraint rebalancing;
- Section 201.6 of the ISO rules, Pricing, to remove subsection 3(2);
- Section 103.4 of the ISO rules, Power Pool Financial Settlement, to remove subsection 7(1)(d) and 8;
- Section 202.7 of the ISO rules, Market suspension or Limited Market Operations, to remove subsection 6(d); and
- Any other incidental or administrative changes required to allow the system marginal price to reflect the constrained system as established by the marginal asset including the transmission constraint rebalancing dispatched asset.
- Date:
- Feb. 5, 2026
- Status:
- Under Review
- Title:
- Proposal to amend ISO rules related to transmission constraint rebalancing
- Proponent:
- ATCO EnPower, Capital Power Corporation, Kineticor and Maxim Power Corp.
Documents
- ISO Rule Amend Proposal TCR - Redacted[Posted: February 10, 2026]