Georgetown Solar Project Connection (2396)
Georgetown Solar Inc. (Georgetown) has applied to the AESO for transmission system access to connect its proposed Georgetown Solar Project (Facility) in the Carseland area. Georgetown's request can be met by the following solution:
- Add one 240 kV transmission line to connect the Facility to the existing 240 kV transmission line 924L in a T-tap configuration.
- Add or modify associated equipment as required for the above transmission developments.
Market Participant Notification
- Market Participant Notification for the Georgetown Solar Project Connection in the Carseland Area [Posted: Feb. 2, 2023]
Need Overview
- Need for the Georgetown Solar Project Connection in the Carseland area [Posted: Sept. 6, 2022]
Latest updates
- Market Participant Notification for the Georgetown Solar Project Connection in the Carseland Area
- Need Overview: Georgetown Solar Project Connection