SS-54 Substation Upgrade (2921)
ENMAX Power Corporation (EPC) has applied to the AESO for transmission system access to reliably serve growing demand for electricity in the Calgary area. EPC’s request can be met by the following solution:
- Upgrade the existing SS-54 substation, including adding one 138/25 kilovolt (kV) transformer and one 138 kV circuit breaker.
- Add or modify associated equipment as required for the above transmission development.
Need Overview
- Need for the SS-54 Substation Upgrade [Posted: March 18, 2026]
Latest updates
- Need Overview: SS-54 Substation Upgrade