    Sunnynook Solar Connection (2464)

    Sunnynook Solar Energy Inc. (Sunnynook) has applied to the AESO for transmission system access to connect its proposed Sunnynook Solar project (Facility) in the Hanna area. Sunnynook’s request can be met by the following solution:

    • Add one 240 kilovolt (kV) transmission line to connect the Facility to the existing 240 kV transmission line 9L24 using a T-tap configuration.
    • Add or modify associated equipment as required for the above transmission developments.

    Need Overview

    Latest updates

    • Jun. 28, 2023 Need Overview: Sunnynook Solar Connection