Halkirk 2 Wind Power Project Connection (2441)
Capital Power (Halkirk 2) L.P. (Capital Power) has applied to the AESO for transmission system access to connect its approved Halkirk 2 Wind Power Project (Facility) in the Halkirk area. Capital Power’s request can be met by the following solution:
- Add one 240 kilovolt (kV) transmission line to connect the Facility to the existing 240 kV transmission line 9L16 using a T-tap configuration.
- Add or modify associated equipment as required for the above transmission developments.
Need Overview
- Need for the Halkirk 2 Wind Power Project Connection in the Halkirk area [Posted: August 2, 2023]
Latest updates
- Need Overview: Halkirk 2 Wind Power Project Connection